EAc4 Equipment Life not represented accurately in ref. guide

NC-2009 EAc4:Enhanced Refrigerant Management
posted by  Alvaro Reyes  on 

Regarding EAc4 equipment life, the reference guide tries to summarize the equipment life by system from the ASHRAE Applications Handbook 2007, but does not accurately represent heat pumps.

3
Default Avatar
Energy Analyst
The Wall Consulting Group
LEEDuser Basic Member
1 thumbs up
Wed Jun 11, 2014, 7:37 pm

Bank tellers need tasklighting?

CI-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Saju Varghese  on 

Would bank teller stations need tasklighting (or are they considered workstations) for the purpose of this credit?

2
LEED Fellow, WELL AP
JLL
LEEDuser Basic Member
125 thumbs up
Wed Jun 11, 2014, 7:19 pm

Worst Case Scenario

EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lamps
posted by  AtSite Inc  on 

I have scoured the internet for HG content of a few of the CFLs we have in our building with no luck. Let's say I can't find HG content and thus cannot know whether the CFLs meet NEMA guidelines.

2
Wed Jun 11, 2014, 1:45 pm

Outdoor Air through Revolving Doors

NC-2009 IEQc2:Increased Ventilation
posted by  Omer Moltay  on 

We have a single space in our building (entrance lobby) that is being naturally ventilated through the revolving doors at the main building entrance.

3
Wed Jun 11, 2014, 1:39 pm

Denied during design reviews=NOT reviewed during const. review?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Tim Crowley  on 

We are working on a LEED Schools 2009 project and have had several credits come back with this comment as part of the Construction Preliminary Review: "This credit was previously denied after recei

9
Default Avatar
LEEDuser Expert
472 thumbs up
Tue Jun 10, 2014, 8:09 pm

IEQc5 for Healthcare

Healthcare-v2009 IEQc5:Indoor chemical and pollutant source control
posted by  Alicia Neubauer  on 

The credit mentions that pressurized entryway vestibules are required for high volume building entrances but I don't see on the template where this information is entered.

2
Tue Jun 10, 2014, 6:20 pm

Guide to ASHRAE 62, and especially Natural Ventilation

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Joseph Snider  on 

Hi All, In Florida, we are constantly dealing with the Natural Ventilation section in ASHRAE 62.1-2007.

4
Managing Director
Energy Cost Solutions Group
LEEDuser Premium Member
13 thumbs up
Tue Jun 10, 2014, 5:27 pm

Prerequisite

NC-v4 IPc1:Integrative process
posted by  Lorne Mlotek  on 

Just want confirmation that there is no prereq for performing IP.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Jun 10, 2014, 2:30 pm

Campus vs Group vs individual buildings

LEED Guidance for Campuses and Multiple Buildings
posted by  Lou Niles II  on 

Hello I have a project that is comprised of three different buildings that are actually on a college campus.

2
Tue Jun 10, 2014, 1:44 pm

Fan power calculations

CS-2009 EAp2:Minimum Energy Performance
posted by  Mark Stromberg  on 

I have a question regarding the pressure drop adjustments. We are doing energy modeling for a data center.

2
Tue Jun 10, 2014, 1:36 pm