EAc4 Equipment Life not represented accurately in ref. guide
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Alvaro Reyes on
Regarding EAc4 equipment life, the reference guide tries to summarize the equipment life by system from the ASHRAE Applications Handbook 2007, but does not accurately represent heat pumps.
Bank tellers need tasklighting?
CI-2009 IEQc6.1:Controllability of Systems—Lightingposted by Saju Varghese on
Would bank teller stations need tasklighting (or are they considered workstations) for the purpose of this credit?
Worst Case Scenario
EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lampsposted by AtSite Inc on
I have scoured the internet for HG content of a few of the CFLs we have in our building with no luck. Let's say I can't find HG content and thus cannot know whether the CFLs meet NEMA guidelines.
Outdoor Air through Revolving Doors
NC-2009 IEQc2:Increased Ventilationposted by Omer Moltay on
We have a single space in our building (entrance lobby) that is being naturally ventilated through the revolving doors at the main building entrance.
Denied during design reviews=NOT reviewed during const. review?
posted by Tim Crowley on
We are working on a LEED Schools 2009 project and have had several credits come back with this comment as part of the Construction Preliminary Review: "This credit was previously denied after recei
IEQc5 for Healthcare
Healthcare-v2009 IEQc5:Indoor chemical and pollutant source controlposted by Alicia Neubauer on
The credit mentions that pressurized entryway vestibules are required for high volume building entrances but I don't see on the template where this information is entered.
Guide to ASHRAE 62, and especially Natural Ventilation
NC-2009 IEQp1:Minimum IAQ Performanceposted by Joseph Snider on
Hi All, In Florida, we are constantly dealing with the Natural Ventilation section in ASHRAE 62.1-2007.
Prerequisite
NC-v4 IPc1:Integrative processposted by Lorne Mlotek on
Just want confirmation that there is no prereq for performing IP.
Campus vs Group vs individual buildings
posted by Lou Niles II on
Hello I have a project that is comprised of three different buildings that are actually on a college campus.
Fan power calculations
CS-2009 EAp2:Minimum Energy Performanceposted by Mark Stromberg on
I have a question regarding the pressure drop adjustments. We are doing energy modeling for a data center.