Submitting documents on LEED online for EAc4

NC-2009 EAc4:Enhanced Refrigerant Management
posted by  Mridul Sarkar  on 

Hi In a preliminary design review for our project, the reviewer has asked us to provide supplementary calculations to show the credit compliane.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Jul 28, 2014, 2:45 am

Using 5% of Total Parking Slots instead of 5% of FTE

CI-2009 SSc3.3:Alternative Transportation—Parking Availability
posted by  Katherine Ann Resurreccion  on 

Similar to the situations below. We are certifying only the 7F of a building (294 FTE) under LEED CI v2009 and according to this credit we need to provide 15 slots fro carpools.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Sat Jul 26, 2014, 6:02 pm
2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Sat Jul 26, 2014, 5:31 pm

Difference VOC emissions - VOC content (adhesives and sealants)

CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Tom Peeters  on 

I'm having difficulties to understand the difference between the VOC emission requirements and the VOC content requirements as stated in the LEED-draft.

3
Sat Jul 26, 2014, 3:30 pm

FTE Calculation

Calculating FTEs
posted by  Sriram Gopal  on 

Hi, I have a slight confusion in calculating FTE to monitor energy consumption. Example. Totally 500 people. 200 people are working in two projects general shift of 8 hrs. The remaining 300 are

3
Sat Jul 26, 2014, 3:27 pm

How to interpret "Huddle Rooms"?

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Brian Salazar  on 

Hello - We are in the process of certifying an interior fit-up which utilizes a number of small "huddle rooms" which are enclosed spaces roughly the size of a private office, but furnished with occ

4
Senior Project Engineer
Whitman, Requardt & Associates, LLP
LEEDuser Basic Member
6 thumbs up
Sat Jul 26, 2014, 12:39 pm

Alternative Compliance Path Outside the US

CI-2009 MRc5:Regional Materials
posted by  Katherine Ann Resurreccion  on 

Hi I am currently handling a LEED CI project in the Phillipines. Apparantly I have encountered an addenda Stating an Alternative Compliance Path Outside the US for LEED CI.

4
NH Green Consulting
LEEDuser Premium Member
80 thumbs up
Sat Jul 26, 2014, 5:07 am

Bike Racks for the Existing Building?

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Greengrade User  on 

Hello all, We have a project that is attached to an existing facility at a University.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Jul 25, 2014, 11:16 pm

Portland Cement

NC-2009 MRc5:Regional Materials
posted by  Rezkar Abdulmajeed  on 

Hi, There is two methods of transport for the Cement I use for concrete in my project; It is coming by water to the port from an approximate distance of 2100 Km and then shipped by truck for 148

5
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Jul 25, 2014, 2:28 pm

How to handle private elevators into residences

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Heather Appell  on 

We are working on a few high-end/high rise residential projects that are designed to have elevators open into the private residences.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Jul 25, 2014, 1:34 pm