Documentation for Project-Specific Recycling of Commingled Waste
NC-v4 MRc5:Construction and demolition waste managementposted by Erica Downs on
All the guidance I can find says to "provide documentation of project-specific rates" or the facility's annual average rate. I cannot find info on what kind of documenation would be required
Vacant Retail Spaces and Materials and Resources Credits
NC-v4.1 MRc4:Material Ingredientsposted by Gabrielle Mote on
I had a clarifying question as we near our final construction submittal for LEED. Our building consists of occupied space for City Hall with 5 retail spaces on the ground floor.
LEED v4.1 - Third Party Certifications
NC-v4 EQc2:Low emitting materialsposted by Pablo Jimeno on
Hello All,
We are considering adopting LEEDv4.1 requirements for the Low Emitting Materials credit across our projects.
Parking Base Ratios for Rescue Station
NC-v4 LTc7:Reduced parking footprintposted by Anna Pooler on
Hello,
Baseline Required Outdoor Airflow for Toilets
NC-v4 EAp2:Minimum energy performanceposted by Junaid Mujahid on
Hi Forum Users!
Contractor Declaration template
NC-v4 SSp1:Construction activity pollution preventionposted by Summer Gorder on
Does anyone have an example Declaration form tat complies with the documentation option below, if the GC can't locate photos:
Clarification on Baseline System Type and Exceptional Calculation for Phased Data Center Project
NC-v4 EAp2:Minimum energy performanceposted by Anurag Ghosh on
Dear Forum Members,
Where should Covered parking goes in exterior lighting format
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi,
I am working on a LEED project and I am confused as to Where should Covered parking goes in exterior lighting format.
Baseline HVAC Modelling - System 8, Electric Resistance Heating, and Heat Recovery (ASHRAE 90.1‑2010 Appendix G)
NC-v4 EAp2:Minimum energy performanceposted by Anurag Ghosh on
Hi All,
We are modelling a commercial tower under ASHRAE 90.1‑2010 Appendix G. The proposed design includes:
Regd. Primary Secondary Pump Arrangement in PRM Baseline System 8 Modelling
NC-v4 EAp2:Minimum energy performanceposted by Anurag Ghosh on
Hello All,