Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

System status report for ventilation system

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Sundararaj Subburaman  on 

We are pursuing LEED-EB:O&M for an office building. It has BAS functions for heating, ventilating, and air conditioning system.

2
Director of Operations
Transwestern Sustainability Services
LEEDuser Basic Member
355 thumbs up
Tue Oct 18, 2011, 5:54 pm

SSc6.1 Pond with Flow Restrictor and Total Stormwater Volume

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Sandra Bauder  on 

I am having the same issue as Lucy (October 18, 2010) on one of our current projects, and the comments by Gregory and Jennifer were helpful but I still have some questions. Scenario: -existing impe

2
Principal
Emerald Built Environments
LEEDuser Basic Member
900 thumbs up
Mon Oct 17, 2011, 7:16 pm

EAp2- Energy Modelling and Process Loads

NC-2009 EAp2:Minimum Energy Performance
posted by  Marcio Alberto Casado Pereira  on 

Hi, I am working on a project (Stadium) where the only significative improvement on energy performance is lighting because the COP of the HVAC is basically the same and the envelope is not much

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Oct 17, 2011, 4:50 pm

NC or CS

LEED Rating System Selection
posted by  Magnus Stagnäs  on 

Our client (who is also the building owner) is performing a major renovation of an existing office building.

4
Principal
Emerald Built Environments
LEEDuser Basic Member
900 thumbs up
Mon Oct 17, 2011, 4:43 pm

Educational program

NC-2009 IDc1:Innovation in Design
posted by  Veronika Sundberg  on 

We want to go for the two Green Education strategies, signage program and education. Is it enough to educate the staff on a regular basis as a goal for the educational program?

5
Fri Oct 14, 2011, 6:47 am

EAp2-Natural Ventilation v/s No HVAC

NC-2009 EAp2:Minimum Energy Performance
posted by  Marcio Alberto Casado Pereira  on 

I am trying to determine if a project of an Industry ( "New Construction") without HVAC system get some special credit or if it is possible to obtain the 10% improvement between Baseline and Propos

3
Thu Oct 13, 2011, 6:45 pm

ID credits and LEED Online Forms

NC-2009 IDc1:Innovation in Design
posted by  Laurie McEachern  on 

We are attempting 5 innovative ID credits for a NC 2009 project. LEED Online is only allowing me to fill out one form for one credit. Am I missing something?

3
Thu Oct 13, 2011, 6:35 pm

EBOM Recertificaton - one time assessments

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by   Habitech Distretto Tecnologico Trentino  on 

According to the TEMPORARY GUIDANCE FOR RECERTIFICATION UNDER LEED for EXISTING BUILDINGS: OPERATIONS & MAINTENANCE published by GBCI on 10/05/2010 at point C) it is stated that: "One-time asse

2
Principal
Ackerstein Sustainability, LLC
LEEDuser Expert
545 thumbs up
Wed Oct 12, 2011, 1:19 pm

Automatic Lighting Shut-off in Hotel Guest rooms

NC-2009 EAp2:Minimum Energy Performance
posted by  Arub Vijay  on 

I have a hotel building with 150 keys aiming for LEED Silver..can anybody advise if all the guest rooms shall have automatic lighting shut-off controls (occupancy sensors, key/card controlled etc).

3
Default Avatar
Director
ENERGYZEAL Smart Architecture & Sustainability Consulting
LEEDuser Basic Member
31 thumbs up
Wed Oct 12, 2011, 1:15 pm

IAQ procedure

posted by  Chad Saleeby  on 
3
Tue Oct 11, 2011, 10:31 pm