MRc2-Concrete Not Poured from Truck and Returned to Batch Plant
NC-2009 MRc2:Construction Waste Managementposted by Gregg Behmer on
Is our leftover concrete, not poured from the truck and returned to the batch plant, counted as diverted from landfills per MR2 if we can provide documentation that it is reused by the batch plant
SSc1, Path 12
CI-2009 SSc1:Site Selectionposted by David Lauchner on
If the building we have selected has an Energy Star rating of 95, can this be submitted for Path 12: Other Quantifiable Environmental Performance?
Renewable Energy Contract question...
NC-2009 EAc6:Green powerposted by Rick Alfandre on
Our client is trying to sign a 2 year contract for renewable energy, and the company he is engaged with only offers 1 year.
Residential building above
Retail-CI-v4 EQp2:Environmental Tobacco Smoke Controlposted by Francisco Sanchez Arroyo on
I am thinking of upgrading a v2009 project to V4 but I am concerned if I will meet the requirements of this prerrequisite.
Please Consider Universal Accessibility
Pilot-Credits EQpc78:Design for active occupantsposted by Jonathan Ramsey on
Requirement 5 states "Locate a main staircase to be visible before an occupant visually encounters any motorized vertical circulation (elevator/escalator).
Can Ice rink and Ski centre be excluded
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Leanne Niu on
Recently, i am working for a complex commercial project including a ice rink and a ski centre. These two spaces are acturally very special, whether we can exclude them when we consider thermal comf
Non-smoking campus - are exterior signs required?
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Renee Shirey on
My project is on a college campus that is non-smoking on the entire campus, there are no areas with permitted smoking. The streets themselves are university property, not public streets.
Sensor based lavatory faucet compliance
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Faisal on
Hi, How should be the compliance (of 0.25gpc) for sensor based lavatory faucet be checked if the manufacturer mentions only “ adjustable from 1 - 20 minutes “ , the model in question is EAF-200-P-
PFP fan allowance in Table 1.4
NC-2009 EAp2:Minimum Energy Performanceposted by Omar Elrawy on
I have a VAV with PFP system for basecase, and I need to know how to count for the zone fan power in table 1.4, knowing that I did enter each AHU's fan power from the Energy model to table 1.4, the