Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

swimming pools - baseline

NC-2009 EAc1:Optimize Energy Performance
posted by  Sonia Martini  on 

Hi The building I'm coping with includes some swimming pools. In the proposed case I've modeled them so that they conform to the project. How should I model them in the baseline case?

3
Thu Jan 31, 2013, 2:18 pm

Lighting Power Density Calculation

NC-2009 EAc1:Optimize Energy Performance
posted by  J Douglas Dietrich  on 

Should under-cabinet, individually-controlled, task lights be included as part of the ASHRAE building area method lighting power density calculation?

3
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Jan 30, 2013, 7:32 pm

Part of Factory is designed but won't be installed now

NC-2009 EAp2:Minimum Energy Performance
posted by  Valentin Grimaud  on 

Dear community, I am wondering how I should read the language of the 90.1 in the following case: - My project includes lots of process and related HVAC, which have been designed to 90% completion

3
Thermal Engineer
TERAO Green Building Engineering
LEEDuser Basic Member
28 thumbs up
Thu Jan 31, 2013, 1:56 pm

VRF efficiency requirements

NC-2009 EAp2:Minimum Energy Performance
posted by  Rudolph Carneiro  on 

Hello; Question; Are VRF sistems exempt from the efficiency requirements of 90.1-2007? Section 6.4.1.3 states that equipment not listed can be used. If they are exempt, why?

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Jan 30, 2013, 8:44 pm

Individual Offices

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  AMY VAN DAM  on 

Any further insight on individual offices (one occupant)?

9
Wed Jan 30, 2013, 7:54 pm
5
President
Design Management Services
LEEDuser Premium Member
25 thumbs up
Wed Jan 30, 2013, 7:24 pm

Activity/tracking log documentation

EBOM-2009 SSc2:Building Exterior and Hardscape Management Plan
posted by  John Mascarenhas  on 

If the goal is 100% implementation of the Plan, does USGBC still require activity/tracking log and other evidence to be documented and submitted?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Jan 30, 2013, 7:08 pm

LEED Interpretation: get recycled content figures by plant

NC-2009 MRc4:Recycled Content
posted by  Tristan Roberts  on 

LEED Interpretation #10246, out on 10/1/12, makes a pretty big change to documentation requirements for MRc4 (effective for pro

11
Wed Jan 30, 2013, 5:02 pm

Undefined Outdoor Spaces and Exterior Lightning

CS-2009 EAp2:Minimum Energy Performance
posted by  Luis Miguel Diazgranados  on 

Greetings Everyone I'm working on a office project with outdoor spaces within the LEED Boundary. The project's construction phase is almost finished.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Jan 30, 2013, 3:11 pm

LEED 2009 O+M WE-P1

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  Bruce Albright  on 

We can use some guidance on revising our submittal template to meet the reviewers clarification request.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Jan 30, 2013, 1:05 pm