Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Door & Wall Protection

Healthcare-v2009 IEQc4:Low-emitting materials
posted by  Catherine Blakemore  on 

Does door and wall protection count as a wall finish? Does it need to be listed on the IEQc4, Group 2 - Wall & Ceiling Finishes Table on the IEQc4 Form and have to comply CDPH/EHLB Standard Me

4
Wed Apr 9, 2014, 9:05 pm

DIRTT Millwork on a LEED project

CI-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Valerie Molinski  on 

Anyone else use this on a project in lieu of tradional millwork fabricated by a local shop? The reason I ask is because we are in the final stages of trying to specify DIRTT millwork for a project

3
Environmental Stewardship Manager
Tarkett North America
LEEDuser Basic Member
64 thumbs up
Wed Apr 9, 2014, 8:05 pm

Pilot Credit 43... How many projects have attemped this credit?

Pilot-Credits PC43:Certified Products
posted by  Jason Gasperich  on 

In looking at all of the different certifications available in the marketplace and trying to determine which of these are right for our company and products, I have begun to wonder if there are any

2
Technical Information & Public Affairs Manager
UL Environment
LEEDuser Basic Member
356 thumbs up
Wed Apr 9, 2014, 7:43 pm

e-waste recycling event open to the public

EBOM-2009 MRc8:Solid Waste Management—Durable Goods
posted by  Chris Miller  on 

If the building hosts an electronic waste recycling event that is open to the public, can the e-waste from that event count toward MRc8?

3
Default Avatar
LEED Project Engineer
Lilker EMO Energy Solutions
LEEDuser Basic Member
2 thumbs up
Wed Apr 9, 2014, 4:53 pm

LEED Silver with EAp2 only?

CS-2009 EAc1:Optimize Energy Performance
posted by  Matt Humphreys  on 

Is it possible for a project to achieve LEED Silver and only meet EAp2 by demonstrating 10% energy cost savings?

2
Sustainability Director
Lake|Flato Architects
LEEDuser Basic Member
78 thumbs up
Wed Apr 9, 2014, 4:16 pm

Gas metering

EBOM-2009 EAc3.2:Performance Measurement—System-Level Metering
posted by  Oana Stamatin  on 

In our office building, the annual Gas Consumption accounts for more than 40% of the total annual energy consumption. The gas is used for Heating and for Cooking (for a Restaurant).

5
LEED AP BD+C
Colliers International
LEEDuser Basic Member
1 thumbs up
Wed Apr 9, 2014, 10:40 am

3 floors + Attic: LEED Homes or LEED NC?

LEED Rating System Selection
posted by  Mario S.  on 

Good day, I have a residential development project outside the U.S which consists of several low-rise buildings of 3 stories + Attic (3rd floor hence consists of a duplex).

8
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Wed Apr 9, 2014, 7:30 am

To weigh, or not to weigh?

NC-2009 MRc2:Construction Waste Management
posted by  Lawrence Lile  on 

We have a project with some existing asphalt pavement that will be busted up and used as clean fill on the same project.

2
Senior Project Manager
Zinner Consultants
LEEDuser Basic Member
110 thumbs up
Wed Apr 9, 2014, 1:24 am

Data Centers in LEED v3 - exceptional calculation method?

NC-2009 EAp2:Minimum Energy Performance
posted by  Jeremy Rapoza  on 

I have a relatively large data center (200kw connected load) in a relatively larger building (250k sf) so that the data center is not the major program space, but is a relatively large minority of

3
Default Avatar
Engineer
Tighe & Bond
LEEDuser Basic Member
7 thumbs up
Tue Apr 8, 2014, 8:18 pm

Changing the Timeline

Living with LEED Online - quirks, bugs and hiccups
posted by  Charles Nepps  on 

After uploading an considerable amount of credit data (but not submitted for review), I noticed that the project is set up to have a split review.

5
NH Green Consulting
LEEDuser Premium Member
80 thumbs up
Tue Apr 8, 2014, 4:34 pm