Forum quick links
Paver with SRI testing
NC-v4 SSc5:Heat island reductionposted by Lynn Gordon on
Will a stone paver that has been tested and meets the SRI requirement for roofs be acceptacle for hardscape? Or does the paver need to be re-tested for SR?
Thank you,
How to treat a renovation of existing building with areas that a not within the scope of renovation.
CS-v4 EAp2:Minimum energy performanceposted by Eric Dixon on
I am modeling an existing office that is being "re-shelled" and having all of it's windows replaced as well as some HVAC Plant and HVAC zone terminal upgrades in 7 of the 9 floors which are unoccup
NAUF plywood and European E1 plywood
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Dario Matteini on
Hi all, I think this might have already been clarified somewhere, but I cannot find an official answer.
Local requirements for rainwater management
CS-v4 SSc4:Rainwater managementposted by Guillaume Rose on
Hi,
Certifying a new airport terminal using LEED - exclude the runways?
NC-v4 SSc2:Site development - protect or restore habitatposted by Ricardo Sá on
Dear All,
One of our clients is considering the possibility of certifying a new airport terminal using LEED and asked us to perform a preliminary evaluation of the potential LEED score.
Achievable point in the case of a non-target criteria
posted by Guillaume Rose on
Hi,
I have a question about point calculation for a Core & Shell certification on LEED v4.
Minimum occupancy
posted by Asil Rashid on
I am working on certifying an office building for LEED EBOM v4 that has just been certified for LEED Core & Shell.
Table 1 when I have only one transit type: Bus
NC-v4 LTc5:Access to quality transitposted by Konstantina Kalliakoudi on
Hello to all,
I have following questions: In my project I have only one transit type: Bus.
Multizone VAV with FCUs
NC-v4 EQp1:Minimum indoor air quality performanceposted by Gopinath Vasu on
Hi All,
Sub meters replaces building-level electric meters
NC-v4 EAp3:Building-level energy meteringposted by DAVE LI on
We have a stand-alone office building on a corporate campus receives electricity from a campus central utility plant, and the office building is no Building-level energy meters.