Are VOC Budgets standard practice?
NC-v4 EQc2:Low emitting materialsposted by Rick Farrell on
As a commercial "wood only" flooring contractor we often do site finished
Dual toilet flush rate average
CS-2009 WEp1:Water Use Reductionposted by Mike D on
If we were to calculate the average flush rate of a dual flush toilet (with urinals present in the space) we use the example average flow rate equation provided by USGBC in their Appendix A water c
v4.1 Renewable Energy // heat pump in Tier1?
NC-v4.1 EAc5:Renewable Energyposted by Claudia Sturcz on
Dear All,
Environmental Product Declarations Exemplary Performance
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Shane Doyle on
Hello,
Measuring Devices WELL v2
posted by Przemysław Rejczak on
Dear Everyone
Minimum Energy Performance Calculator- Required for Option 2?
CI-v4 EAp2:Minimum energy performanceposted by Oliver Bate on
Hi,
Get Out the Vote Letter Party next Tuesday, Oct 13
posted by Nadav Malin on
Hi friends,
US Architects Declare Commitment
posted by Erica Weeks on
Seeking Pros/Cons, Feedback/Commentary about signing the US Architects Declare Commitment.
https://us.architectsdeclare.com/
Enhanced Commissioning
Schools-NC-v4 EAc1:Enhanced commissioningposted by matt kaye on
Under LEED V4, is the General Contractor able to hire the CX agent as a direct subcontracor on a governemt job pursuinmg enhanced commissioning credit?
What transit qualifies?
ND-Plan-v4 NPDc7:Transit facilitiesposted by Peter Doo on
Is this credit earned if amenities are provided for transit stops that do not meet the frequency requirements of SLL Access to Quality Transit?