Forum quick links
LEED and Passive House
posted by Douglas Flandro on
Has anyone had any success with achieving the LEED Building Envelope commissioning points with an alternative compliance path using the requirements of the PHIUS verifier?
shower quantity discrepancy for large-occupancy projects
NC-v4.1 LTc6:Bicycle Facilitiesposted by Megan Bodin on
There is a discrepancy between the requirements for shower quantities for large-occupancy projects.
Extra point for multiple routes / 60%?
NC-v4.1 LTc5:Access to Quality Transitposted by Joseph Snider on
Under v4, there is an option for getting an extra point if you have a number of different routes and nothing is more than 60% of the trips. Does anyone know if that option is stil available u
Interior Reuse - is pipework and air duct Interior non structural elements?
CI-v4 MRc2:Interiors life-cycle impact reductionposted by shashank gangil on
We are doing a LEED CI V4 project. The client will use existing air duct, diffuser, grilles, provided by the landlord and AC chilled water pipe.
Regional ACP for LEM VOC Emissions Evaluation - Manufacturer statement
NC-v4.1 EQc2:Low-Emitting Materialsposted by Muhammad Mahasneh on
Greetings,
i would like to ask about the April 2023 Update to the Regional ACP ID# 100002473 regarding Low Emitting materials:
Option 2: Priority Designation - local equivalent program
NC-v4 LTc3:High priority siteposted by N. Josef Nassif on
Dear Community
I hope you are doing fine.
I have a question regarding the Option 2 in high-Priority site. In LEED V4 it says:
NBBJ Launches ZeroGuide – An Early Phase Carbon Estimation Tool
posted by Peter Alspach on
Hey Everyone!