Topic | Recent |
---|---|
lighting controlsRetail-CI-v2009 EAc1.2: Optimize energy performance - lighting controlsposted by ARGIA ARROYO BUGANZA on Feb 21, 2013, 12:18 pm
LEED REQUIREMENT: Verify 15’ perimeter needs to be covered for daylight dimming- This includes private offices-all spaces WHAT HAPPENS ONE OF MY... Last reply: yingling guan, Feb 19, 2024, 11:04 pm |
|
Opt 2, path 4 Reuse and Salvaged Material requirementNC-v4.1 MRc1: Building life-cycle impact reductionposted by Dave Hubka on Oct 10, 2022, 11:18 am
I can't seem to find a minimum threshold for the amount of reused / salvaged materials required to be able to achieve all (4) points within Opt 2 Path 4. Does anyone know if... Last reply: Dave Hubka, Feb 19, 2024, 8:24 am |
|
How can I register a Resort Project with multiple distinct physical structures with one exceeding 25000 Sq.ft.? Description: I uHospitality-NC-v4 MPR2: Must use reasonable LEED boundariesposted by Manzil Shrestha on Feb 18, 2024, 10:50 am
How can I register a Resort Project with multiple distinct physical structures with one exceeding 25000 Sq.ft.? |
|
Base ratios for hospitalsHealthcare-v4 LTc7: Reduced parking footprintposted by Donal Dignan on May 7, 2018, 6:42 pm
I'm working on a hospital project which qualifies as Case 2 (although it's not urban and qualifies by way of diverse uses only) for this credit and am trying to work out the base ratio of parking... Last reply: Keith Robertson, Feb 16, 2024, 11:03 am |
|
Compliance Strategies and SuccessesPilot-Credits MRpc102: Legal Woodposted by Chris Pyle on Nov 29, 2019, 3:06 pm
Hi all! I'm looking to achieve this Pilot credit for my project. How have people found success achieving this? My thought is to insert the "ACP" language under the Recycled Content... Last reply: Terrapin BrightGreen, Feb 15, 2024, 6:50 pm |
|
Utility-Specific GHG CoefficientsPilot-Credits EApc95: Alternative Energy Performance Metricposted by on Feb 15, 2024, 5:21 pm
Has anyone utilized a Utility-specific... |
|
Integrative Analysis of Building Materials- Work Smarter, Not HarderPilot-Credits MRpc103: Integrative Analysis of Building Materialsposted by Marina Rullo on Oct 23, 2023, 12:16 pm
This pilot credit is a useful way to both qualitatively and quantitatively examine the human health implications, environmental impacts, and safety impacts of building materials. We’ve... Last reply: , Feb 15, 2024, 1:21 pm |
|
Predictive Climate DataNC-v4 EAp2: Minimum Energy Performanceposted by Dave Hubka on Feb 15, 2024, 8:21 am
Are there any firms performing energy models with future predictive climate data rather past published climate data? If so, I wonder if the ghost of energy modeling future is scarier than... Last reply: Sarah Leenknegt, Feb 15, 2024, 9:11 am |
|
Temperature and Humidity LoggingNC-v4 EQc4: Indoor air quality assessmentposted by Nancy Henderson on Sep 20, 2019, 7:38 pm
We have a 2-story building with multiple independently operating HVAC systems. We are looking for guidance on how to log temperature and humidity during the flush-out. The temperature will be... Last reply: Dave Hubka, Feb 14, 2024, 11:32 am |
|
Envelope Description Reference- Using California Building Energy Efficiency Standard (Title 24) as reference?NC-v4 EAp2: Minimum Energy Performanceposted by Moses Chong on Feb 5, 2024, 4:33 pm
Hi! I know that we have to describe the construction of the opaque envelope and reference the 90.1 Appendix A table in the minimum energy performance calculation. Can I use the... Last reply: Jamy Bacchus, Feb 13, 2024, 9:16 pm |