Forum quick links
Joint Use of Facilities Credit Use!
Schools-2009 SSc10:Joint Use of Facilitiesposted by Bayardo Selva on
I submitted a Memo on Letterhead stating which parts of the facilities where going to be used on non school hours. However, LEED also wants an a Shared use policy?
Please comment on NAAB proposed accreditation Conditions by July 18
posted by Mary Ann Lazarus on
Hi SD Leaders: As you may know, The National Architectural Accreditation Board (NAAB) is currently drafting their proposed 2020 Conditions for Architectural
The number of water meters required
CS-v4 WEc4:Water meteringposted by Erkki Seinre on
How detailed does the sub-metering have to be to account for 'at least 80% metered subsystem'?
Basic Amenities Within the Main Building
CI-2009 SSc2:Development Density and Community Connectivityposted by Aswin M on
We have a Retail Commercial Interior project inside a Main building. The Main building has many amenities such as restaurant,library, departmental stores, beauty salon, etc,.
Pre development conditions for v4
NC-v4 SSc4:Rainwater managementposted by Gabriela Mesquita on
Good morning,
How to calculate 5% of the site’s vegetated area (excluding preserved or restored habitat area)?
Pilot-Credits SSpc82:Local food productionposted by Adriana Hansen on
Hi everyone, as my team was studying the Local food production requirements, there was a doubt about how to address to the BD+C area requirement below:
PV Panles over compliant white membrane with a high SRI
CS-2009 SSc7.2:Heat Island Effect—Roofposted by Guillermo Hernandez Espinoza on
Hi Everyone.
TVOC and CO2 Testing Recommendations for Arc
posted by Ece Ersoz on
Hi,
Measurements for CO2 / TVOC
Hospitality-EBOM-v4.1 EQp4:Indoor Environmental Quality Performanceposted by Denaye Hinds on
Where should these measurements be taken throughout the property/building and how many per zone are required?
TRACE 700 Performance Report - Optimal
NC-v4 EAp2:Minimum energy performanceposted by Mark Norris on
Good Afternoon,