Post a question or comment
Filter by location
Forum
Topic
Replies
Recent
7
Mon Mar 16, 2020, 5:32 pm

Points in Addition to Renewable Energy Production?

NC-v4 EAc2:Optimize energy performance
posted by  Dianne Herrin  on 

Hi - Our solar PV system is adding two points to our "optimize energy performance" category due to the cost offset.

3
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Mon Mar 16, 2020, 5:29 pm

District cooling

CS-v4.1 WEc3:Optimize Process Water Use
posted by     on 

Hello,

does anyone have experience with district cooling related to option 3? What type of DC system is compliant? And what does specifically "recycled alternative water" stand for?

2
Editorial Director
BuildingGreen, Inc.
LEEDuser Expert
159 thumbs up
Mon Mar 16, 2020, 1:13 pm

Frit Pattern

Pilot-Credits SSpc55:Bird collision deterrence
posted by  Chelsea Miller  on 

Is having a frit pattern necessary if you have a really low ratio of glass to opaque surface?

1
Fri Mar 13, 2020, 11:03 pm

Analysis of building stock for reuse/demo

Green Commons
posted by  Michelle Amt  on 

Hi all, has anyone come across a comprehensive (and recent) study looking at how long buildings actually last (beyond Stewart Brand)?

10
Fri Mar 13, 2020, 6:13 pm

Electrical Commissioning Scope

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Renee Azerbegi  on 

We have several clients who are implementing LEED v4.

13
Fri Mar 13, 2020, 4:45 pm

AIA 2030 Reporting Question

Green Commons
posted by  Kjell Anderson  on 

So every year about this time I get to spend many lovely moments with our AIA 2030 Reporting data.

13
Fri Mar 13, 2020, 3:45 pm

Indoor Lighting Quality in LEED v4 BD+C Hospitality projects.

Hospitality-NC-v4 EQc6:Interior lighting
posted by  Susan Di Giulio  on 

Hi, 

I have a few hotels working their way through LEED v4. I understand that Guestrooms should not be counted for Option 1; lighting controls.

1
Tue Mar 31, 2020, 3:56 pm

Baseline Chillers

NC-2009 EAp2:Minimum Energy Performance
posted by  Santiago Sánchez Sánchez  on 

Greetings,

We are working on a large project which has 10 customized Chillers each chiller over 2,000 tons.

1
Fri Mar 13, 2020, 2:26 pm

Modeling Future Tenant Spaces

CS-2009 EAc1:Optimize Energy Performance
posted by  Anna Kaelin  on 

As our C&S spaces are a future build out we have to predict what the fan power in our FCUs will be. We have manufactures data for all the potential FCUs that could be connected to the

1
Fri Mar 20, 2020, 6:44 pm