Forum quick links
PVC Welding Cement
NC-v4 EQc2:Low emitting materialsposted by Kerry Honsinger on
Anyone come up with a PVC Welding Cement that meets the CDPH Standard Method v1.1 -2010 emissions requirement?
Building height
Pilot-Credits SSpc55:Bird collision deterrenceposted by BELEM SALOMON on
Hi, all the facade materials comply with the threat factor, so no calculation is needed, however I have two questions:
Air purifiers, seperate from HVAC systems
NC-v4.1 INc1:Innovationposted by Jackson Eagle on
Hi all,
Update documentation for previously awarded/anticipated credits
posted by Jorng-ren Chern on
Our project has submitted for the Design Review and some credits have been marked as anticipated.
Short and Long Term Together?
NC-v4 LTc6:Bicycle facilitiesposted by Summer Minchew on
Can short and long term spaces be located together as long as all other requirements are met?
Bipolar Ionization devices; documenting reduced outside air quantities
Schools-NC-v4 EQp1:Minimum indoor air quality performanceposted by on
I have a new school project which currently has ionization devices throughout the HVAC RTUs. These ionization devices reduce the required outside air.
Show and Tell Time! Share your passion in a five minute presentation
posted by Nadav Malin on
It’s Summer Summit season! One of the “good problem to have” challenges we’ve had at recent SDL Summits has been too many great five-minute presentations. It’s hard to find time for them all.
IES thermal block and baseline model with system 6
NC-v4 EAc2:Optimize energy performanceposted by Ying Lindsey on
Dear all,
I need your professional opinion about a project that I am currently working on.
Embodied Carbon 101
posted by Jean Carroon on
Hi All,
I wanted to share a program of superstars including many of you. I look forward to electronically connecting and learning together.
Supervisor can hire Cxa?
NC-v4 EAp1:Fundamental commissioning and verificationposted by Vanessa Montezuma Ramos on
We are participating in a Design-Build project of more than 20,000 ft2. Can the supervisor of the general contractor hire the Commissioning Agent?