Forum quick links
Option 1: 2% or 5%, Option 2: 6% or 10%?
NC-v4.1 LTc8:Electric Vehiclesposted by Timothy Ian Middleton on
Thanks to LEED User I just discovered the latest version of NC4.1_LTc8 requires 5% of spaces to comply with Electric Vehicle Charging Requirements, instead of 2%.
Documenting Construction Credits for Individula registered projects within Master Site...
posted by Rick Alfandre on
We are working on a project with a Master Site and 2 registered projects on the site. For Construction Credits such as Mr 4 Recycled Content our budget is for the overall project,
Storage and Coll. of Recyclables Prereq. - Storage Area Access
Healthcare-v4 MRp1:Storage and collection of recyclablesposted by Jeff Frederick on
The LEED 2009 BD+C Reference Guide clearly distinguishes recycling collection areas from the central recycling storage area, and describes the required access of each.
SCAQMD Rule 1168 (Amended October 6, 2017)
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Wai Hoong Yap on
I have a silicone sealant which is classify as "All Other Architectural Sealants", which VOC content limit that I should use? Is it the current 250g/L? or 1/1/2019 (50g/L)?
VOC content requirements for adhesives and sealants
NC-v4 EQc2:Low emitting materialsposted by Craig Graber on
If I read the v4 VOC content requirements literally (always a risky proposition) then it appears that wet applied adhesives and sealants must only meet the chemical content requirements of SCAQMD R
Tree Nursery in Site Design
NC-v4 WEp1:Outdoor water use reductionposted by Rebecca Bryant on
Hello All,
IDc1.5 Water Restoration Certificates
CS-2009 IDc1:Innovation in Designposted by Juan Guerrero on
Hi everyone, after the credit is done and the construction starts to run, how I can verificate the real numbers with the one who were obtained of the calculator?
INpc136 - Daily Journal Further Specifications
Pilot-Credits INpc136:Safety First: Re-Enter Your Workspaceposted by Frida Villa on
Is there a requirement/recomendation on how long the daily survey needs to be applied for?