Printing used for bldg occupants, but outsourced

EBOM-2009 MRc1:Sustainable Purchasing—Ongoing Consumables
posted by  Ted Mendoza  on 

I have a client that has several departments under a building that is being LEED EB-OM certified. One of the departments has a "significant" budget attributed to generating handouts, flyers, etc.

6
Fri Feb 25, 2011, 12:46 pm
3
Fri Feb 25, 2011, 5:28 am

Use of clerestories for IEQc8.1?

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Karen Stewart  on 

After review of the requirements for IEQc8.1, it appears to me that light from clerestories is not allowed in the calculations for this credit. Am I missing something?

7
Fri Feb 25, 2011, 3:16 am
5
Fri Feb 25, 2011, 2:50 am

Clarification on Minimum Daily Transit Service

Pilot-Credits PC12:Reduced Automobile Dependence
posted by  Colin Inderwish  on 

We're also attempting option 1. The project is located in a fairly dense area with a total of 4 different light rail stops within a 1/2 mile walking distance.

2
Thu Feb 24, 2011, 8:20 pm

online form

NC-2009 MRc2:Construction Waste Management
posted by  Rick Vayo  on 

Hi, I'm having trouble with the online form. I've filled in the required information, but the percentage of waste diverted is not totaling for me. I'm not sure what I'm doing wrong. thanks,

3
Default Avatar
EcoConsulting
LEEDuser Basic Member
549 thumbs up
Thu Feb 24, 2011, 7:48 pm
3
Environmental Stewardship Manager
LEEDuser Basic Member
114 thumbs up
Thu Feb 24, 2011, 6:50 pm

Unit Clarification

posted by  Heather Eberhardt  on 
3
Default Avatar
Principal
von Staden Architects
LEEDuser Basic Member
7 thumbs up
Thu Feb 24, 2011, 5:19 pm

Electric bicycles in Asia

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Louise Schlatter  on 

We are starting to get projects in Asia and have learned that they use both standard (human operated) bicycles and also something we don't have in the US: electric bicycles.

7
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Feb 24, 2011, 3:16 pm

Phased Occupancy and IAQ Testing

CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Melissa Wrolstad  on 

I have a CI project with 4 floors and phased occupancy. Two floors will be occupied while two are still under construction.

2
Thu Feb 24, 2011, 2:53 pm