Owner Furnished Task Lighting
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Ryan L on
Under ASHRAE 90.1-2007 task lighting must have automatic shutoffs; the owner prefers not to install occupancy sensors/shutoffs at individual workstations.
option 2. views
EBOM-2009 IEQc2.4:Daylight and Viewsposted by Brian Dougherty on
I am trying to calculate the requirements and was wondering about some technical details. This is for a library on a college university. 1. Does the window sill have to be between 30-90"?
Baseline HVAC system for residential building
NC-2009 EAp2:Minimum Energy Performanceposted by LEED Pro Consultant on
Hello, We are working on a residential project where the HVAC system won´t be provided for the apartments, the project scope contemplates the preparation and space for the equipments so every own
"Other USGBC approved multi-attribute certification programs"
Pilot-Credits MRpc80:Environmentally preferable interior finishes and furnishingsposted by Sara Goenner Curlee on
Is there any further definition of this part of the requirement? What other than furnishings has been tracked to achieve this credit?
Category "Other" for WEc4 LEED for Schools
Schools-2009 WEc4:Process water use reductionposted by Suzanne Painter-Supplee, LEED AP+ID&C on
Does anyone have an idea what process water using appliance could be considered "other?" i.e. a pulper, waste collector, both alternatives to disposals?
Release diesel agent
Healthcare-v2009 IEQc4:Low-emitting materialsposted by Gustavo De las Heras Izquierdo on
Is a release DIESEL agent prohibited under this or any other credit in LEED Certification?
Asphalt Milling - Will this qualify for MRc3 & MRc2?
NC-2009 MRc3:Materials Reuseposted by Joel Simonyak on
As part of our project the existing asphalt parking lot will be milled and the material will be reused in the new asphalt lot. The asphalt plant happens to be just across the highway.
Option 2 fails TVOC - will Retest Pass?
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Sandi Carney on
I was the responsible party who ran the baseline IAQ testing event a a newly constructed 6,000 SF teaching facility. The TVOC results came back yesterday and were 4,900 ug/m3.
ventilation rate according 62.1
NC-2009 IEQp1:Minimum IAQ Performanceposted by Marco Abdallah on
Dear LEED Team, just calculated the ventilation rate according the ashrae 62.1.2007 for a office building and now really wonder about the low outdoor air rate: Density: 100 ft²/person (net occupi