Post a question or comment
Filter by location
Forum
Topic
Replies
Recent
7
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Apr 30, 2014, 3:31 pm

Modelling Basement Parking

NC-2009 EAp2:Minimum Energy Performance
posted by  Omar Elrawy  on 

I'am modelling a building with 2 levels of underground parking, which is unconditioned, opened to the outdoor, and having 4 fans (2 supply and 2 exhaust), while the exhaust fans are DCV's based on

9
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Wed Apr 30, 2014, 1:37 pm

Open space/ LEED boundary

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Tammy Dalton  on 

I am working on a project that is part of a leasehold located within an executive airport property.

2
Wed Apr 30, 2014, 11:29 am
4
President
Green Sage Consulting LLC
LEEDuser Premium Member
8 thumbs up
Tue Apr 29, 2014, 11:41 pm

Community Connectivity - Campus Services

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Shannon Terrell  on 

In the review process for our project. We have received teh following comment: "It is unclear whether all of the community services are available to the general public.

4
Default Avatar
Architect, LEED Consultant
Polk Stanley Wilcox Architects
LEEDuser Basic Member
29 thumbs up
Tue Apr 29, 2014, 9:14 pm

Temporary vs. Permanent Power

NC-2009 MPR6:Must commit to sharing whole-building energy and water usage data
posted by  Donald Green  on 

I posted this under MPR2 but thought I might get a response under this MPR as well... We have a project that may not have its permanent power for as long as a year after occupancy.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Apr 29, 2014, 8:00 pm

IEQc3.2 Option 2: Air Testing

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Christopher Strunk  on 

Currently doing a LEED v.2009 project and are looking to pursue IEQc3.2, Option 2. We got a question from the air quality tester asking about the specific requirements for testing.

2
Default Avatar
LEED AP (O+M)
4 Elements Group
LEEDuser Basic Member
34 thumbs up
Tue Apr 29, 2014, 7:11 pm

2009 BD+C/ID+C Calculation problem for Heat Island Effect - Roof

CI-2009 SSc1:Site Selection
posted by  Laurie Thorwart  on 

Hey all, Please bear with me, as this question is complicated and takes into account a couple different documents/rating systems.

3
Tue Apr 29, 2014, 5:42 pm

Liquid Ice Melt

EBOM-2009 SSc2:Building Exterior and Hardscape Management Plan
posted by  cathy keagle  on 

Can anyone provide guidance on the types of Liquid Ice Melt that would satisfy the requirements of this credit?

3
Tue Apr 29, 2014, 5:32 pm

Raw Material Extraction/Harvest Locations

NC-2009 MRc5:Regional Materials
posted by  Dianne Carey  on 

We manufacture coating and adhesive products. Determining the point of extraction/harvest of our raw materials is becoming more and more difficult to "trace".

13
Director of Technical Services
W. R. MEADOWS, Inc.
LEEDuser Basic Member
0 thumbs up
Tue Apr 29, 2014, 3:39 pm