Sun Control Window Films

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Julien Lafond  on 

This project with large window areas is installing sun control window films which rejects 72% total solar energy and gives 66% of solar heat reduction.

2
Wed Jul 9, 2014, 1:53 am

HVAC Systems Selection for Baseline

CS-2009 EAc1:Optimize Energy Performance
posted by  Mark Stromberg  on 

My question is regarding the following procedure as outlined in Trace 700 help: "To determine which ASHRAE baseline system to model, refer to ASHRAE Standard 90.1-2007, Table G3.1.1A (below).

9
Wed Jul 9, 2014, 1:39 am

3 Residential Tower + 1 Commercial Shop lot

LEED Guidance for Campuses and Multiple Buildings
posted by  SW LEE  on 

Hi, Im confuse, on which path i should choose to register my project and it's fee. Scenario : the project has a huge parcel of land, and consist few building.

2
Sr Project Manager / Operations Manager
Progressive AE
LEEDuser Basic Member
25 thumbs up
Tue Jul 8, 2014, 12:09 pm
4
Default Avatar
Senior Sustainability Manager
UL Solutions
LEEDuser Premium Member
7 thumbs up
Tue Jul 8, 2014, 4:25 am

Chemical/Hazardous Gas Area Separation

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Brian Harris  on 

We have a project that has a garage which has storage, mechanical and other occupied spaces accessed through doors.

3
Default Avatar
Principal
TCA Architecture Planning
LEEDuser Premium Member
5 thumbs up
Mon Jul 7, 2014, 10:13 pm

Electric instantaneous water heater

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  CT G  on 

Hi, The design team is specifying an electric instantaneous water heater on a project we are working with.

5
Default Avatar
LEEDuser Premium Member
19 thumbs up
Mon Jul 7, 2014, 10:08 pm

Methyl Hydrate Solvent

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Lilian Seow  on 

This is for cleaning pipes prior actual coating and painting application. I understand that this solvent does emit strong odor and as such application after hours is preferred.

2
Mon Jul 7, 2014, 3:44 pm

LEED Boundary Question

NC-2009 PIf2:Project Summary Details
posted by  Todd Bundren  on 

I have an interesting case. A building on my site is being demolished as part of my project scope and will be grassed over.

3
Associate Principal - Director of Sustainabilty
Lawrence Group
LEEDuser Premium Member
10 thumbs up
Sun Jul 6, 2014, 2:10 pm

Who includes taxes in their cost calculations?

NC-2009 MRc7:Certified Wood
posted by  Kevin Flynn  on 

Just curious - how many of you include taxes in the cost calculation for your materials credits? I typically only include the cost of the wood (or other material) products themselves.

9
Principal
Jason Grant Consulting
LEEDuser Expert
115 thumbs up
Sun Jul 6, 2014, 1:41 pm

Reclaimed wood

NC-2009 MRc4:Recycled Content
posted by  Christina Quilter  on 

Our project is utilizing a significant amount of wood reclaimed from an old cannery in the area.

10
Default Avatar
Energy Engineer/LEED Consultant
Community Environmental Center
LEEDuser Basic Member
3 thumbs up
Fri Jul 4, 2014, 6:41 pm