Topic | Recent |
---|---|
What you are saying is indeedSchools-2009 SSc9: Site Master Planposted by Erik Bergstrom on Dec 9, 2009, 12:42 pm
What you are saying is indeed in line with the comments we received. However, what is the value in completing two calculations when, for stormwater, the Master Plan is a worst case scenario, and... Last reply: Shannon Gray , Dec 11, 2009, 3:55 pm |
|
Retail space parkingCI-2009 SSc3.3: Alternative transportation - parking availabilityposted by Alex Warburton on Nov 26, 2009, 1:21 pm
This retail space is aprox 2000ft2 and has more spaces (6) allocated to it than code requires. Last reply: Alex Warburton, Dec 10, 2009, 2:44 pm |
|
Illogical ETS requirement for existing non-res. buildings?NC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by JOHN BURNETT on Dec 9, 2009, 1:45 am
"Prohibit on-property smoking within 25 feet of entries, outdoor air intakes and operable windows." Anyone know why 25ft? Last reply: Tristan Roberts, Dec 10, 2009, 12:08 pm |
|
Master Plan:Open SpaceSchools-2009 SSc9: Site Master Planposted by Erik Bergstrom on Dec 9, 2009, 12:55 pm
GIven that the requirement for Open Space is that it is to be "dedicated" over the life of the building, I'm having trouble deciding which plan (current, or master) to use for the SSc5.2 section... |
|
Factory in VietnamCI-2009 EAp2: Minimum Energy Performanceposted by Fabio Frescia on Dec 8, 2009, 5:14 am
I have a US client that is renting a space inside an existing factory to put in it his laundry facilities services. It's a part of a big warehouse, all a big environment, so it won't be possible... Last reply: Shillpa Singh, Dec 9, 2009, 8:40 am |
|
Energy StarCI-2009 EAp2: Minimum Energy Performanceposted by Alison Woolf on Nov 30, 2009, 1:56 pm
A few of the manufacturers do not have... Last reply: Erik Dyrr, Dec 8, 2009, 4:48 pm |
|
Interior renovation within a single tenant buildingCI-2009 SSc3.3: Alternative transportation - parking availabilityposted by Peter Doo on Nov 17, 2009, 5:35 pm
Radiology suite within and existing urban hospital seeking a LEED CI certification. Last reply: Steve Loppnow, Dec 8, 2009, 2:42 pm |
|
Site Master Plan- RecalculationsSchools-2009 SSc9: Site Master Planposted by Erik Bergstrom on Dec 7, 2009, 2:30 pm
According to our review team for a Schools project, we are required to provide documentation for each selected Master Plan credit. For example, for stormwater, they are asking us complete two... Last reply: Shannon Gray , Dec 7, 2009, 7:02 pm |
|
Regionally manufactured materialsNC-2009 MRc5: Regional Materialsposted by Carrie Gunzel on Dec 7, 2009, 4:07 pm
1) We took non-... Last reply: Nadav Malin, Dec 7, 2009, 5:52 pm |
|
Better option for going into a LEED-CS Gold Certified BuildingCI-2009 SSc1: Site Selectionposted by Dean Barone on Dec 6, 2009, 5:47 am
Our client is going into a LEED Certified building and will automatically get 5 points. However, when we will look at Option 2 - we can achieve up to 12 points by meeting several path... Last reply: Derek Fung, Dec 6, 2009, 11:49 pm |