Forum quick links
LEED EBOM, SS2 & Water Efficiency
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by AtSite Inc on
How many sq. ft. of landscape is needed to qualify for landscape credits?
Lighting control in office space
NC-v4 EQc6:Interior lightingposted by Jeroen Sap on
I am working on an office building that has overhead lighting that is controlled based on occupancy sensors. The fixtures are grouped per 3,6 meters and there is no manual override.
Evaporative Chiller in EAp2?
NC-2009 EAp2:Minimum Energy Performanceposted by Yastimy Jupson on
Hello everyone, i'm now joining a LEED project and the owner wants to use 50RT evaporative chiller in their building, but in ASHRAE standard 90.1, i cannot find the mandatory part for evaporative c
Air Quality Testing after completion
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Mike Stopka on
Hello I have a project that is very close to LEED Gold. I am trying to lock down one more point. The project is in the final phase of the construction submission for LEED.
Where do I enter residential units in form?
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Maria Porter on
My project is a nursing home with some workstations for staff. In the form (v 4.0) on LEED Online there is nowhere to fill out what lighting controls the residents have.
Exemption for Labs
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Amit Ahiel on
Let me preface my question with some context. I have a client (world famous for their electronic gadgets) who is building a lab for research and development of new gadgets and components.
Link to the v4 Water Calculator
NC-v4 WEp2:Indoor water use reductionposted by Dylan Connelly on
http://www.usgbc.org/resources/indoor-water-use-calculator
Can Janitor closet be tied to restroom exhaust
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Leticia SooHoo on
Hello, we are working on a commercial office building project. We are intending to meet the requirements of IEQc5 by providing exhaust to the janitor closets.
ANSI/BIFMA Testing Date vs Manufacture Date
CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seatingposted by Nicole Schuster on
This credit requires that the manufacturing period must be within the certification period.
EAp2 Online form - Table EAp2-1. Space Usage Type -
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, There is a clarification question associated with a reviewer's remark. From the modeling software (Trace 700) reports, the spaces are divided to Regularly occupied and Unconditioned (as