Forum quick links
Regional Steel
NC-2009 MRc5:Regional Materialsposted by Chris Klehm on
We have steel on a project that is documented to be 99% recycled content, all recovered within 500 miles of the project site.
Crushed concrete
NC-2009 MRc4:Recycled Contentposted by Hrvoje Kvasnicka on
We will be using crushed concrete from an exiting building on site for subbase for access road. I understand this cannot be used for MRc3 Material Reuse, but rather for MRc4.
Modeling Water-source Variable Refrigerant Volume Systems
NC-2009 EAp2:Minimum Energy Performanceposted by Eric Webber on
Hey everyone, I have a question about the best software choice and modeling strategy for water-source VRV (or VRF) systems.
MR Project boundary in multi story building
CI-2009 MPR2:Must be a complete, permanent building or spaceposted by Kathleen Burke on
the building is 11 stories with an atrium. The tenant is taking part of 1, all of 2, part of 3, all of 4, NONE OF 5, half of 6 and all of 7.
Trying to locate 2yr, 24hr rainfall info for Central America
posted by John Klein on
LEED 2.2 Registered Projects
posted by David Posada on
Checking the GBCI website and LEED Certification Policy manual (page 35) it looks like version 2.2 projects will sunset on June 27, 2015 http://www.gbci.org/main-nav/building-certification/resourc
Music Classroom
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Dave Barg on
The school I am documenting has a Music Classroom that is mostly composed of ACT which meets the required NRC of .7, however, some of the ACT tiles have been replaced by Pyramid Sound Diffusers wit
ITE parking study?
posted by Chris Miller on
So do you have to purchase the study in order to do the calculations for LEED? Is there any way to do this without purchasing the document? Thanks
Optimize Energy Performance -HVAC-
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Gustav Alfaro on
Hi, I have a couple of questions regarding EAc1.3 1.
open space not within LEED project boundary
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Lindsey Evans on
In the LEEDuser FAQ's above it states, "Can a project designate open space off-site and not within the LEED project boundary to meet the credit requirements?