Exam room sinks

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Laura Charlier  on 

Do sinks in exam rooms need to be included in the calculations? They are primarily used for handwashing. If so, are they entered as 'sinks' or 'lavatories' as the baseline? Thanks.

3
Fri Feb 20, 2015, 10:58 pm

Construction Waste Diversion vs Material Re-Use

CS-2009 MRc2:Construction Waste Management
posted by  Tim Gaidis  on 

Hi all, I'm working on a LEED-NC v3 major renovation project that has veered just below it's 50% MRc2 CWM target and have 2 questions below: Please note: We are pursuing 3 pts for the MRc1.1 Build

4
Default Avatar
LEEDuser Expert
472 thumbs up
Fri Feb 20, 2015, 10:20 pm

Charrette duration / delivery flexible?

NC-v4 IPc1:Integrative process
posted by  Vince Briones  on 

Has anyone had success with (2) 2-hr sessions being accepted as compliant (by GBCI) for the integrated design team charrette?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Feb 20, 2015, 7:47 pm

Actual building floor area and modeled floor area

NC-2009 EAp2:Minimum Energy Performance
posted by  Haojie Wang  on 

I wonder if there is a rule on how much the difference between the actual and modeled floor area can be in LEED. Thanks

3
Default Avatar
Energy Modeler
KJWW Engineering
LEEDuser Basic Member
3 thumbs up
Fri Feb 20, 2015, 10:07 am

appendix of ieqp1 template vs 62MZcalc

NC-2009 IEQp1:Minimum IAQ Performance
posted by  J.W. Shin  on 

Is there someone who experience any result differences between template and 62MZcalc? I put some data into 62MZcalc, then I tried to let them into template either. But, in my case, value of Ev wasn

2
Thu Feb 19, 2015, 5:19 pm

Part-load efficiency (IEER)

NC-v4 EAp2:Minimum energy performance
posted by  Charalampos Giannikopoulos  on 

According to Table 6.8.1B of ASHRAE 90.1.2010 it is required that the baseline HVAC systems serving spaces have a specific full-load and part-load efficiency.

3
Thu Feb 19, 2015, 3:37 pm

Glare control

CS-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Belén Valladares López  on 

Hi, We're working in a project trying to achieve this credit by option 3 (measurement). Our façade is an existing curtain wall. There are two different skins.

3
Thu Feb 19, 2015, 2:40 pm

Guidance on calculations with multiple inputs

Schools-2009 MRc4:Recycled Content
posted by  Esther Kohout  on 

Where would I find the information needed to calculate the recycled content of a finished product.

2
Default Avatar
LEEDuser Expert
472 thumbs up
Wed Feb 18, 2015, 6:44 pm

CPG - Efficiency Compliance

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Jonathan Caisido  on 

Hello, I would like to know on how to comply CI EAc1.3 if using base build Chilled Water Fan Coil Units.

3
Wed Feb 18, 2015, 3:14 pm

LEED for Homes V4 International

LEED for Homes (LEED-H) Forum
posted by  Emmanuel Pauwels  on 

I am looking for a Green Rater for a multifamily project in Europe. Anyone ? Would not mind getting trained as a Green Rater myself in the process...

2
founder/principal
Design AVEnues LLC
LEEDuser Expert
8 thumbs up
Wed Feb 18, 2015, 9:46 am