If the owner requires VOC testing, what equipment do you recommend? A PID? If so, how many ppms are permissable?
LEEDuser is supported by our premium members, not by advertisers.
Go premium forTo post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.
Do products applied to the weather barrier need to comply with VOC thresholds?
How do I determine what application my product falls under?
How is VOC % less water determined for aerosol adhesives?
Do grout and caulking need to be included, and if so, what is the application category?
Tristan Roberts
RepresentativeVermont House of Representatives
LEEDuser Expert
11478 thumbs up
December 10, 2009 - 10:20 am
Aliesa, it sounds like you are talking about VOC testing of the indoor environment following construction, not VOC testing of materials. The latter is better performed by labs using specific protocols.
For testing of the air quality in the building, check out IEQc3.2: Construction IAQ Management Plan—Before Occupancy. You can earn a point here for IAQ testing following certain protocols.
Armen Khachikyan
80 thumbs up
April 22, 2010 - 3:59 am
Thus, to earn IEQc4.1 VOC testing of materials should be performed?
(I know there is some characteristic like emissioning VOC from materials, as i understand we shouldn't measure it; just VOC content. Is it right?)
Tristan Roberts
RepresentativeVermont House of Representatives
LEEDuser Expert
11478 thumbs up
April 22, 2010 - 6:42 pm
Lou, to earn this credit you should specify and use only products that meet the VOC emissions limits set by the relevant standard as shown in the credit language. This is generally done by the manufacturer, with VOC g/L information provided to the project. It is not necessary for you to take any measurements.