NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Panupant Phapant  on 

Dear All Our project uses PP-R pipe (Polypropylene Random Copolymer) for chilled water piping. The PP-R pipes is connected together by welding.

3
Default Avatar
SCG Cement - Building Materials
LEEDuser Basic Member
13 thumbs up
Thu Mar 26, 2015, 11:19 am

A site with large building footprint

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Magda Aghababyan  on 

Hello, Mine is a greenfield site that has a building footprint that takes almost the entire land.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Mar 26, 2015, 3:52 am

Point Structure For MRc5

NC-2009 MRc5:Regional Materials
posted by  Robert Sherlock  on 

Has the point structure for this credit changed from 10% - 20% to 20% - 30%

3
Default Avatar
Western Industrial Contractors Ltd
LEEDuser Basic Member
0 thumbs up
Thu Mar 26, 2015, 2:49 am

HVAC System 8 Baseline

CS-2009 EAp2:Minimum Energy Performance
posted by  CINDY CHAI  on 

Hi all, Currently I have a project in Malaysia that is going for LEED Core and Shell (2009), the project consists of multiple buildings but will be certified under one certificate.

3
Default Avatar
ESD SENIOR ENGINEER
KAER SDN BHD
LEEDuser Basic Member
0 thumbs up
Thu Mar 26, 2015, 12:39 am

LEED 2009 for Retail: Commercial Interiors EAc1.5

Retail-CI-v2009 EAc1.5:Optimize energy performance - building envelope
posted by  Robert Brown  on 

We have an existing building being renovated. The existing building envelope does not meet ASHRAE 90.1-2007 criteria.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Mar 25, 2015, 3:02 pm

IEQP1 Online template

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Stella Stella  on 

Hi All, Our project has some of the areas that are mechanically ventilated (AHU/FCU) and some spaces that are naturally ventilated. We have provided the details for both.

4
Wed Mar 25, 2015, 2:19 am

Systems manual

CS-2009 EAc3:Enhanced Commissioning
posted by  Michael E. Edmonds-Bauer  on 

We are done with our commissioning process and almost ready to submit for preliminary construction review, however the systems manual (Upload EAc3-1) is develop in Spanish language since it is the

4
Tue Mar 24, 2015, 10:58 pm

Monitoring System

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Marina Andrade  on 

Hi! In the project we have not a BMS system to monitor energy consumption but the electric company will be regularly measured.

8
Sr. Sustainability Consultant
Taitem Engineering
LEEDuser Basic Member
36 thumbs up
Tue Mar 24, 2015, 5:59 pm

Garage below grade

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  FABIO VIERO  on 

Hi All, I'm now working on a project under LEED certification which aims to pursue this credit. This project has an external parking area (which is included in the LEED Boundary) above grade and ex