Forum quick links
Criteria for Space usage type
NC-2009 PIf3:Occupant and Usage Dataposted by Alicia Villanueva on
How should I select the column "Space Usage Type" for each space. My criteria is to assign the type of space which each particular room serves.
C&S Individual Project within a Campus Registration
posted by Nate Steeber on
This may be a very simple question, and perhaps our team is looking into this too deeply: We have a campus which we intend to use a Master Site with individual registrations (i.e. not a group).
Integrated System - Space heating and water heating
NC-2009 EAp2:Minimum Energy Performanceposted by CT G on
We are working in a project that has a gas-fired boiler that supplies hot water for space heating (radiant floor) and domestic hot water. Do we need to comply with efficiencies in tables 6.8.1F an
Areas passing at one time but not another
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Lisa Fabula on
If part of the building area passes at 9am but does not pass at 3pm does that mean we cant use that 9am area for that time.
Baseline HVAC Model System-8 VAV PFP Boxes with Outdoor Air Unit
NC-2009 EAp2:Minimum Energy Performanceposted by Ivan Priatman on
Dear LEED, We are designing a medical office with VRF system, to fulfill iaq requirements we add independent outdoor air unit comprises of supply and exhaust fans on each zone.
Minimum Ventilation rates for Production area
NC-2009 IEQp1:Minimum IAQ Performanceposted by sriram tetali on
Hi all Can u suggest the Ventilation rates for the Production / manufacturing areas for a Pharmaceutical clients because ASHRAE doesn't mention any for the Production in the Table 6-1
Hello,
I am documenting this
NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by Michael Russo on
Hello, I am documenting this credit using the simulation method. For many of the regularly occupied spaces, the rooms are above the 10fc requirement except for a small corner of the room.
Healthcare MRc4.1: rated hours for lamps or ballasts?
Healthcare-v2009 MRc4.1:PBT source reduction - mercury in lampsposted by Megan Shelby on
For LEED-Healthcare MRc4.1, can you confirm that the rated hours criteria is for the lamp or the ballast?
Duration for online survey
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Jessica Hawley on
We are planning on sending out an emailed link to an online electronic transportation survey on a Monday to survey our building's entire tenant population about their commute for the prior week (M-
Is EAc2 affected by the use of the ACP calculation for EAc1?
CS-2009 EAc2:On-site Renewable Energyposted by Charlie Christenson on
Working on a core & shell project that is planning to install a PV system sized to offset 1% of total building energy cost.