Topic | Recent |
---|---|
Thermal Comfort SurveyCI-2009 IEQc7.2: Thermal comfort - verificationposted by Simon Sue on May 20, 2010, 2:58 amJames, there's been some good discussion on this issue over on the forum for the NC version of this credit.It's our understanding that all occupants must be surveyed or at least have an opportunity to be included.Since the survey will most likely take place after your certification is awarded, you don't have to provide the results, only commit to doing the survey. Log in or register to post comments 3 Vote up! ... Last reply: Tristan Roberts, May 26, 2010, 5:59 pm |
|
Definition of Building OccupantsNC-2009 IEQc7.2: Thermal comfort - verificationposted by Lauren Sparandara on Feb 21, 2010, 1:16 pm
I am working on a large hospital project that is registered under LEED-NCv2.2. I am wondering how many building occupants need to be surveyed. Does this include just... Last reply: Steve Loppnow, May 26, 2010, 5:55 pm |
|
SSC8 Lamp Lumen CalculationSchools-2009 SSc8: Light Pollution Reductionposted by Scott Ennis on May 26, 2010, 1:47 pm
I am in process of performing a... |
|
RP Credits Listed TwiceEBOM-2009 RPc1: Regional Priorityposted by Jordan Friedberg on May 22, 2010, 8:23 pm
For some zipcodes, the list of regional priority credits lists the same credit twice (eg SS6 in the EB system). I assume this means if I achieve the requirements, I get three times the credit (... Last reply: Tristan Roberts, May 25, 2010, 5:58 pm |
|
Energy Performance and LEED Boundary in v 3Schools-2009 EAc1: Optimize Energy Performanceposted by Karen Anderson on May 25, 2010, 3:20 pm
I'm told that the... |
|
Yard and lawn clippingsNC-2009 MRp1: Storage and Collection of Recyclablesposted by Joanna Jenkins on May 25, 2010, 9:26 am
LEED for Schools requires a project to divert yard clippings from landfills. Is the same true for LEED BD+C 2009? Last reply: Tristan Roberts, May 25, 2010, 1:54 pm |
|
Determining Recycled-Content ValueNC-2009 MRc4: Recycled Contentposted by Evan Shook on May 25, 2010, 9:15 am
In the reference guide there are a few different ways to determine... Last reply: Tristan Roberts, May 25, 2010, 1:51 pm |
|
Common Dumpsters for Numerous ProjectsCI-2009 MRc2: Construction Waste Managementposted by Kristy O'Hagan on Mar 10, 2010, 11:35 am
In a retail project within a shopping center redesign, common dumpsters will be used during demolition and construction for all tennants. There will be co-mingled recycling and recycling rates... Last reply: Victoria Lockhart, May 25, 2010, 11:46 am |
|
Use of LEED Retail Draft credit SS 4CS-2009 SSc4.1: Alternative transportation - public transportation accessposted by V. Miller on May 20, 2010, 8:21 am
I am working on a CS V.3 retail project. Rather than using the standard V3 SS 4.2 requirement, I'd like to use SS 4, Option B from the LEED for Retail Draft Reference Guide inlcuded below. Would... Last reply: Tristan Roberts, May 24, 2010, 9:31 pm |
|
exemplary credit: two commuter train, light rail, or subway lineNC-2009 SSc4.1: Alternative transportation - public transportation accessposted by Anthony Bandy-Zalatoris on May 24, 2010, 9:46 am
Would a BRT (Bus Rapid Transit) line qualify as a... Last reply: Mara Baum, May 24, 2010, 9:00 pm |