Is the credit for during construction, or after envelope is up?
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Nelina Loiselle on
We have an issue with a General Contractor on a project.
SS 4.4 No New Parking.
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Rezkar Abdulmajeed on
I have the first LEED project in a campus. The project will be built on an existing parking lot and no new parking will be added within the LEED project boundary.
Fuel Stations for Shared Parking Lot Outside of LEED Boundary
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Mary Kay on
Our project has no new parking. We are on a campus where there is an existing parking lot adjacent to our building, but not within our LEED project boundary.
Additional lighting power density in a retail store
CS-2009 EAp2:Minimum Energy Performanceposted by Felipe Duran on
Dear All, We are working on a shopping mall project which is pursuing LEED for C&S certification.
Shared building electricity meter
EBOM-v4 EAp2:Minimum energy performanceposted by LEED Pro Consultant on
We have a building which shares electricity meter with an adjacent building, only one building will be intended for certification, it is possible to identify the percentage of consumption in every
small DES
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
For a preliminary review I modeled a building that is heated and cooled by four geothermal heat pumps that are located in a technical room within the building.
Pilot Credit Closed
Pilot-Credits EApc8:Demand responseposted by Haley Duncan on
Hi, It looks like USGBC has closed this pilot credit to NC 2009 projects.
Historical data for an International Convention Centre
posted by Meghan Ward on
Where could we access historical data on occupancy or attendance data of an international convention centre? Would anyone be able to provide a some guidance on calculating FTEs and transients for a
Submitting this point in v2009
EBOM-v4 EQc9:Integrated pest managementposted by Tracy Smith on