VOC Content in VOC Budget Method
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Aber Alvi on
For a project located outside US, should the VOC content of a paint or coating not tested as per SCAQMD or Green Seal or CARB Standards be included in the VOC budget method?
Humidity Calculations at Peak Conditions
Schools-2009 IEQc10:Mold Preventionposted by James Keohane on
I am in the process or completing IEQc10 credit form. The credit form lists a required upload as "Upload IEQ10c10-1.
Fernanda Palacios
CS-2009 EAc6:Green Powerposted by Alessandra Nasi on
Hello, Our company has a Project (in Santiago Chile) and we have a question about the additional requirement calculation for CS Core and Shell Credit 6, Green Power. The credit says that gross SF f
On-going Commissioning
EBOM-2009 EAc2.3:Existing Building Commissioning—Ongoing Commissioningposted by Tracy Smith on
We have already been awarded EAc2.1 and EAc2.2. To get these points we did a retro commissioning report. When we resubmit, we are considering going for EAc2.3.
Multiple Buildings Project Certification
NC-2009 PIf1:Minimum Program Requirementsposted by Mario S. on
We have a project with 3 buildings located on the same plot, that are physically attached by two underground levels made up of technical rooms, parking spaces, bicycle racks, showers and garbage ro
Installed HVAC equipment is less efficient than simulated.
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Gustav Alfaro on
Hi to all: At the end of the project and after the leed design submittal was reviewed and approved, we found that some of the equipment that have been installed in our project are less efficient t
Street versus Alley
ND-Plan-v4 NPDc6:Connected circulation networkposted by Martine Desbois on
Please could you clarify the definition of an alley. For the purpose of connectivity are alleys and streets treated the same way.
Educational program- Case study?
NC-2009 IDc1:Innovation in Designposted by Diaa Madkour on
Hi all, on the reference guide P.596, there are 5 components to pick 2 initiatives.
Reconstructing a floor to account for sea level rise
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Deborah Lucking on
Our project is required (by code) to raise the elevation of the ground floor slab, to account for future sea level rise.