VOC Content in VOC Budget Method

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Aber Alvi  on 

For a project located outside US, should the VOC content of a paint or coating not tested as per SCAQMD or Green Seal or CARB Standards be included in the VOC budget method?

3
Thu Jun 25, 2015, 9:20 am

Humidity Calculations at Peak Conditions

Schools-2009 IEQc10:Mold Prevention
posted by  James Keohane  on 

I am in the process or completing IEQc10 credit form. The credit form lists a required upload as "Upload IEQ10c10-1.

4
Executive Director
Empirical Energy Solutions
LEEDuser Basic Member
23 thumbs up
Wed Jun 24, 2015, 1:45 pm

Fernanda Palacios

CS-2009 EAc6:Green Power
posted by  Alessandra Nasi  on 

Hello, Our company has a Project (in Santiago Chile) and we have a question about the additional requirement calculation for CS Core and Shell Credit 6, Green Power. The credit says that gross SF f

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Jun 23, 2015, 8:54 pm

On-going Commissioning

EBOM-2009 EAc2.3:Existing Building Commissioning—Ongoing Commissioning
posted by  Tracy Smith  on 

We have already been awarded EAc2.1 and EAc2.2. To get these points we did a retro commissioning report. When we resubmit, we are considering going for EAc2.3.

3
Tue Jun 23, 2015, 4:09 pm
2
Default Avatar
Owner
Nicolas M Pacella & Associates
LEEDuser Basic Member
3 thumbs up
Mon Jun 22, 2015, 7:40 pm

Multiple Buildings Project Certification

NC-2009 PIf1:Minimum Program Requirements
posted by  Mario S.  on 

We have a project with 3 buildings located on the same plot, that are physically attached by two underground levels made up of technical rooms, parking spaces, bicycle racks, showers and garbage ro

3
Director - Green Building Advisory
Colliers International Ltd.
LEEDuser Basic Member
201 thumbs up
Mon Jun 22, 2015, 2:59 pm

Installed HVAC equipment is less efficient than simulated.

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Gustav Alfaro  on 

Hi to all: At the end of the project and after the leed design submittal was reviewed and approved, we found that some of the equipment that have been installed in our project are less efficient t

2
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Mon Jun 22, 2015, 2:46 pm

Street versus Alley

ND-Plan-v4 NPDc6:Connected circulation network
posted by  Martine Desbois  on 

Please could you clarify the definition of an alley. For the purpose of connectivity are alleys and streets treated the same way.

3
Sun Jun 21, 2015, 10:01 pm

Educational program- Case study?

NC-2009 IDc1:Innovation in Design
posted by  Diaa Madkour  on 

Hi all, on the reference guide P.596, there are 5 components to pick 2 initiatives.

3
Default Avatar
Tetra Tech
LEEDuser Basic Member
3 thumbs up
Fri Jun 19, 2015, 7:38 pm

Reconstructing a floor to account for sea level rise

NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  Deborah Lucking  on 

Our project is required (by code) to raise the elevation of the ground floor slab, to account for future sea level rise.

2
Default Avatar
LEED Consultant
The Green Engineer
LEEDuser Basic Member
188 thumbs up
Thu Jun 18, 2015, 8:17 pm