Topic | Recent |
---|---|
EPA's Target Finder Rating toolSchools-2009 EAp2: Minimum Energy Performanceposted by Maya Karkour on Aug 4, 2010, 7:48 am
Dear all, I would like to inquire more about the Target Finder Rating tool. Assuming I entered the consumption values and all input parameters, I will generate an energy performance rating... Last reply: Christopher Schaffner, Aug 9, 2010, 8:23 pm |
|
Exterior Building Lighting Power calculationCS-2009 EAp2: Minimum Energy Performanceposted by Adriana Hansen on Aug 5, 2010, 1:48 pm
Hello, I am going to certify a shopping center and I have two questions: 1) Its façade uses recessed volumes to create movement and interesting angles, interposing façade panels at... Last reply: Christopher Schaffner, Aug 9, 2010, 8:12 pm |
|
Useful information regarding the issues with this credit...NC-2009 EAc5: Measurement and Verificationposted by Michael Wymant on Jun 23, 2010, 2:39 pmLast reply: Carey Paul, Aug 9, 2010, 6:56 pm |
|
Thermal bridges in the modelNC-2009 EAc1: Optimize Energy Performanceposted by Lisa Håkansson on Aug 5, 2010, 3:02 am
I can’t find anywhere how detailed the thermal brides should be calculated in the model. In the simulation program I use you can use some default values or calculate the separately in every... Last reply: Marcus Sheffer, Aug 9, 2010, 5:24 pm |
|
Major renovation: HVAC system in baselineNC-2009 EAc1: Optimize Energy Performanceposted by Lisa Håkansson on Aug 5, 2010, 2:55 am
Hi! Last reply: Marcus Sheffer, Aug 9, 2010, 5:19 pm |
|
Proposed HVAC System vs. Baseline SystemNC-2009 EAc1: Optimize Energy Performanceposted by Meagan Kirchhoff on Aug 4, 2010, 8:36 pm
I am having a hard time determining what type of system I should be modeling for my building in both the Proposed AND the Baseline. Here is the deal: Last reply: Marcus Sheffer, Aug 9, 2010, 5:15 pm |
|
Energy Efficient Measures Prior to LEED RegistrationNC-2009 EAc1: Optimize Energy Performanceposted by Jaimee Reynolds on Jul 26, 2010, 1:21 pm
An existing building has replaced their windows and roof in 2007, exceeding ASHRAE 90.1-2007 standards. The building is currently going through a large renovation and will be registering under... Last reply: Marcus Sheffer, Aug 9, 2010, 5:06 pm |
|
Letter Templates Not TransferringCI-2009 MRc4: Recycled Contentposted by Patrick Moore on Aug 3, 2010, 7:54 pm
Has anyone had issues with information you enter on the Recycled Content letter templates not automatically populating on... Last reply: Erica Godun, Aug 9, 2010, 3:52 pm |
|
CS 2009 SSc8: Light Pollution ReductionCS-2009 SSc8: Light Pollution Reductionposted by Viann Lau on Aug 9, 2010, 6:55 am
For interior lighting of CS 2009 SSc8, does it include covered carparking areas? If dimming of light would cause security problem, which option would be more applicable for achieving this credit... |
|
LEED Online v2.0CS-2009 IDc2: LEED Accredited Professionalposted by javier bolanos zeledon on Jul 29, 2010, 11:00 am
I'm sorry if this is to obvious question but I'm new at this. Last reply: javier bolanos zeledon, Aug 8, 2010, 9:08 pm |