NC-v4 SSc4:Rainwater managementposted by Gustavo De las Heras Izquierdo on
Hallo, I have documented SSc6.1 and SSc6.2 for almost 15 projects with a 100% success rate.
LEED Baundary Campus - parking lot
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by gabriel Morales on
We have a campus project consists of 2 towers with retail corporate considered LEED CS and 2 residential towers that are not LEED certified , is underground parking on 5 levels with a design criter
Appeal Design Credits After Construction Review has begun?
posted by Garrett Ferguson on
I have a CS 2009 project where 2 credits were denied in the Design Final Review. We are sitting at 42 points if all goes as planned.
IDF curves
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by MKK LEED on
Hi, I have a NC project in Colombia and the Environmental Authority just have IDF curves since 3 years. I don't have information since 1 and 2 years.
no cooling / using addendums
CS-2009 EAp2:Minimum Energy Performanceposted by Samuel Sura on
Hello, I have two questions: 1) we are working on residential building where its occupied spaces has heating and cooling, but rooms situated on north facade has no cooling system.
LEED v3 CS: IEQ8.1 and 8.2 - How to Calculate Zone Floor Area
CS-2009 IEQc8.2:Daylight and Views—Viewsposted by Maggie Hogan Skaug on
This project is a high rise mixed-use office building pursuing LEED Core & Shell certification with no or limited tenant build-out plans.
TAB Report and Calculations
EBOM-2009 EAp1:Energy Efficiency Best Management Practicesposted by Tom Liebel on
We have just received a request for additional clarification during our final review of our LEED-EBOM 2009 submission, asking us to confirm the date of our TAB report, and pointing us to the the Ca
NC-2009 SSc2: Development Density and Community Connectivity
NC-2009 SSc2:Development Density and Community Connectivityposted by Bouygues Sustainability on
Hi everyone, We are certifying a Hotel. I want to know if we can count in this credit Option 2 the services offered by the hotel. Txs
Controller Efficiency
NC-2009 WEc1:Water Efficient Landscapingposted by Michelle Rosenberger on
I see several threads attempting to get an answer on how one demonstrates controller efficiency and the most prevalent answer seems to be just use 1 because no other values can be substantiated by