Topic | Recent |
---|---|
Tenant Outfit Proposed SpacesCS-2009 EAp2: Minimum Energy Performanceposted by Darren White on Sep 19, 2010, 12:01 pm
I am in the process of simulating a 21 floor building, divided into three uses: offices, school, and retail space. None of the floors are planned and the offices have yet to be designed. If I... Last reply: Marcus Sheffer, Sep 20, 2010, 10:21 am |
|
Process and non-Process energyCS-2009 EAp2: Minimum Energy Performanceposted by Billy Ng on Jul 29, 2010, 10:55 pm
For Core and shell rating system, do I consider the Process energy in the calculation. below equation is what i have in mind after read the guidebook. Last reply: Edwin Wealend, Sep 20, 2010, 9:50 am |
|
WEc2 FormEBOM-2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiencyposted by Rachael McClain on May 6, 2010, 3:30 pm
I'm having problems with the WEc2 form, I can't enter any numbers in to the form where it has zeros. Do you have to complete the WEp1 form before that form becomes active? Last reply: Paul C, Sep 20, 2010, 9:43 am |
|
Uploading Phase II ESA report- where?Schools-2009 SSp2: Environmental Site Assessmentposted by Renee Shirey on Sep 17, 2010, 4:25 pm
In the online template, when I select the Option for utilizing a Phase II ESA report, it prompts me to upload info from the Phase II report. However, when I go to upload the document, it does... Last reply: Renee Shirey, Sep 17, 2010, 5:17 pm |
|
Commercial FaucetsCI-2009 WEc1: Water Use Reductionposted by Zachary Tetreault on Sep 17, 2010, 4:47 pm
The project is one floor in an existing office building. The only bathroom contains one toilet and one faucet. Would the faucet be considered private, similar to a hotel room, or commercial as it... Last reply: Zachary Tetreault, Sep 17, 2010, 5:00 pm |
|
Utilizing scrap collector instead of a garbage disposalSchools-2009 WEc4: Process water use reductionposted by Renee Shirey on Sep 15, 2010, 10:28 am
Has anyone attempted to utilize a scrap collector when attempting WE4? It recirculates the water it uses, reducing supply water usage by 90% over traditional garbage disposals. It would then... Last reply: Suzanne Painter-Supplee, LEED AP+ID&C, Sep 17, 2010, 3:44 pm |
|
Pricing- ToolkitEBOM-2009 EAc4: On-Site and Off-Site Renewable Energyposted by Paul C on Sep 17, 2010, 10:31 am
The pricing document in the toolkit does not provide any pricing numbers. I am just trying to get a feel or what costs are in order to achieve this credit. Thanks. Last reply: Tristan Roberts, Sep 17, 2010, 1:09 pm |
|
Glass Fiber Reinforced ConcreteNC-2009 MRc5: Regional Materialsposted by Linda Davisson on Sep 17, 2010, 9:38 am
I'm looking for GFRC that is manufactured and extracted from within 500 miles of the DC metro area. I tried using the website mrgreenpoints.com but it only gave one local manufacturer. It's so... |
|
Non-centralised AC for office towerCS-2009 EAp2: Minimum Energy Performanceposted by Edwin Wealend on Sep 8, 2010, 12:25 am
HI, We are working on a small soho office tower, about 28 floors tall with a GFA of around 20000m2. We want to use split type or VRV AC unit for the offices instead of doing a full blown... Last reply: Edwin Wealend, Sep 16, 2010, 7:44 pm |
|
Minimum distance between smoking room exhaust and windowsCS-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Maya Karkour on Sep 14, 2010, 10:06 am
Hello, Under option 2 of this credit, the LEED Guidance states that: "At a minimum, the smoking room must be directly exhausted to the outdoors, away from air intakes and building entry... Last reply: Tristan Roberts, Sep 16, 2010, 5:47 pm |