SSc2 Development Density and Community Connectivity

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Greg Snow  on 

My project is located in a hospital campus and I am targeting this credit for 5 points; 3 for community connectivity and 2 for development density.

3
Default Avatar
Gibbons Snow Architects Inc.
LEEDuser Basic Member
0 thumbs up
Mon Oct 12, 2015, 4:14 pm

Target Index

EBOM-2009 EAp1:Energy Efficiency Best Management Practices
posted by  Charalampos Giannikopoulos  on 

Further to a preliminary review of project located outside the U.S.

3
Mon Oct 12, 2015, 2:23 pm

IEQc5 Walk-off mats and low volume printers clarification needed

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Deborah Locklair  on 

We have a mixed use building major renovation on a Government site. There are shops and maintenance areas, some that have unique exhaust systems. Our designer has addressed these requirements.

2
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Fri Oct 9, 2015, 6:23 pm

Non-certifiable Parking Garage within LEED Boundary

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  natalie tan  on 

We are seeking LEED certification for a new office building. A new separate parking garage building (under the same construction contract) falls within the LEED Boundary.

3
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Oct 8, 2015, 9:34 pm

What "floor area" to use

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Lyle Axelarris  on 

Since the credit template is not linked to the Gross Floor area in PIf2 (as it is in other relevant credits), does that mean the floor area in the flushout calcs should be net area, as it is done f

4
Building Enclosure Consultant
BPL Enclosure
LEEDuser Basic Member
58 thumbs up
Thu Oct 8, 2015, 9:15 pm

Bike Rack?

EBOM-2009 MRc2:Sustainable Purchasing—Durable Goods
posted by  Michelle Bracewell-Musson  on 

Hello, I have read to Reference Guide EMOB 2009 and cannot decide if a bike rack that will be permanently installed on the exterior of the building would comply here?

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Wed Oct 7, 2015, 6:28 pm

Renovation Project (Envelope Question)

NC-2009 EAp2:Minimum Energy Performance
posted by  Saju Varghese  on 

The reviewer has asked us for the existing envelope conditions prior to retrofit to be modeled consistent with the requirements of ASHRAE 90.1-2007 Table G3.1.5(Baseline)(f) which says " For existi

3
SUSTAINABILITY COORDINATOR
JALRW Eng. Group Inc.
LEEDuser Basic Member
24 thumbs up
Wed Oct 7, 2015, 3:23 pm

shopping mall airflow rate calculations

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Adam Targowski  on 

The project we are working on is a shopping mall. We are calculating airflow rates according to ASHRAE standard.

4
Wed Oct 7, 2015, 8:59 am

CS Alternative Compliance Path

NC-v4 EAc2:Optimize energy performance
posted by  Joan Kelsch  on 

Will the LEED CS 2009 Alternative Compliance Path continue through to LEED version 4?

5
Wed Oct 7, 2015, 12:42 am

calibration parameters

NC-2009 EAc5:Measurement and Verification
posted by  Edward Niemczycki  on 

We have nearly completed a LEED Silver project and they are still asking for simulation calibration procedures, calibration parameters, frequency of measurement and calibration accuracy for the EAc

5
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Oct 6, 2015, 3:48 pm