Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

v2009v4_Minimum IAQ Performance Calculator_v02 - Any Experience?

NC-2009 IEQp1:Minimum IAQ Performance
posted by  O Moltay  on 

Dear Members, Do you any experience with the v2009v4_Minimum IAQ Performance Calculator_v02 spreadsheet found under Credit Resources for IEQp1?

3
Default Avatar
LEEDuser Basic Member
0 thumbs up
Wed Oct 28, 2015, 8:26 am

cutsheets

NC-2009 MRc5:Regional Materials
posted by  Jian Hui Liu  on 

Clearly i know the project team should provide cutsheets for the materials to support regional materials claims,but i cannot get the meaning of "cutsheets".Which kind of information the cutsheets s

4
Default Avatar
VP of Innovation
Sustainable Investment Group
LEEDuser Basic Member
110 thumbs up
Wed Oct 28, 2015, 8:10 am

Controls or lights within 15' of windows?? or both?

CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controls
posted by  John Kitsalis  on 

Do we need the daylight controls itself to be within 15' of a window/skylight OR Do we need to provide daylight controls FOR WINDOWS within 15' of a window/skylight. OR Do we need to provide da

3
Director - Green Building Advisory
Colliers International Ltd.
LEEDuser Basic Member
201 thumbs up
Tue Oct 27, 2015, 12:45 pm

Engineered natural ventilation system

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Jutta Berns  on 

Hi all We have three Warehouse's that use 'turbo ventilators' (wind driven extraction fans) and not a pure mechanical system.

3
Principal
Integrative Sustainability Solutions
LEEDuser Premium Member
46 thumbs up
Tue Oct 27, 2015, 8:57 am

Baseline modeling for manufacturing facility

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Hi Markus and colleagues, There are few issues which I'd like to share, with a request for some advice related to the Baseline project modeling. The project in question is a manufacturing facility

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Oct 27, 2015, 6:04 am

ACP Revised Points Thresholds

CS-2009 EAp2:Minimum Energy Performance
posted by  Takayuki Hirota  on 

We have a C&S project and are planning the energy simulation for EAp2 and EAc1.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Oct 27, 2015, 12:00 am

Existing building infiltration rates

NC-2009 EAp2:Minimum Energy Performance
posted by  Mike Fortier  on 

We are working on a major renovation of an existing building which includes removing the facade and replacing it with a highly efficient and tightly sealed facade system.

3
Mon Oct 26, 2015, 3:06 pm

Double Transit Ridership

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Ryan McEvoy  on 

For project pursuing double transit ridership, can rides in both directions be counted? For example, a bus line has 50 trips going west and 50 trips going east.

4
Default Avatar
Energy Engineer/LEED Consultant
Community Environmental Center
LEEDuser Basic Member
3 thumbs up
Mon Oct 26, 2015, 4:07 am

Dedicated exhaust system

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Hrvoje Kvasnicka  on 

Hi Can someone please explain what exactly is meant by a dedicated exhaust system? Also - are the self closing doors a requirement or an option?

6
Sun Oct 25, 2015, 8:58 pm

Preferred Parking and LEED Interpretation 10202

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Saud Abdul Rasheed  on 

Hi all, We have received our Final Design Review and the credit has been denied. Now we want to appeal for the credit as the client is willing to provide Low Emitting and Fuel Efficient Vehicles.

2
Director of Sustainability
Fentress Architects
LEEDuser Expert
224 thumbs up
Sat Oct 24, 2015, 6:46 am