Forum quick links
BLDG UNDER CONSTRUCTION
posted by Juan David on
How do I classify a Building already under construction; all Site Utilities in place, 1st Fl. slab in place and 1st Fl Ext. walls already up, in other words a 1st. Fl.
Native species
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Stella Stella on
Hi, We are working on a project in Singapore.
Gross floor area vs. Regularly Occupied Area
Schools-2009 PIf3:Occupant and Usage Dataposted by Ashley Love on
I just received my design preliminary review back for a Schools 2009 project and they commented on PIf3 that the total regularly occupied area reported was inaccurate because some of my gross areas
62.1 and 90.1-2010
NC-v4 EAp2:Minimum energy performanceposted by Samuel Gelfand on
We are working on a high rise multifamily building where the corridors are supplied with 100% semi-conditioned OA. This OA is used both for ventilation (62.1) and conditioning the space.
LEED Certification: EBOMv2009 SSc7.2 Heat Island Reduction Roof
EBOM-2009 SSc7.2:Heat Island Reduction—Roofposted by Andres Giraldo on
Our goal was to submit for certification tomorrow February 13, 2015.
School with unusually large amount of artificial turf
Schools-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Helen Kessler on
100% of the athletic areas for an urban school are made of artficial turf. It's my understanding that this would be counted as hardscape under SSc5.2.
Use of Actual Building Data
ND-v4 GIBp2:Minimum building energy performanceposted by Philippa Cameron on
Hi, The LEED guidance for minimum building energy performance requires compliance to be demonstrated by comparing a simulation model with an ASHRAE 90.1 baseline.
Option 3-Approach 2 Commuter Survey - representative selection
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Christian Bösselmann on
In conducting the commuter survey according to Option 3 / Approach 2 I am would very much appreciate your feedback on the following topics. The multifunctional building is occupied by 1250 regular
Is softball infield at a school open space?
Schools-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Renee Shirey on
Since an infield would be dirt, and not actually "vegetated", should it be excluded from the open space - or am I overthinking it and deducting something that doesn't need to be deducted from the o
CI Lighting Compliance Exemption out of scope
CI-2009 EAp2:Minimum Energy Performanceposted by Alexis Voeltner on
Our CI project does not have lighting included in its scope (very cost prohibitive, for the way lighting is layed out in the space) and base building lighting is being planned to be used as is.