Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Baseline Construction Performance

CS-2009 EAc1:Optimize Energy Performance
posted by  Ciaran McCabe  on 

When modelling the Baseline where the building is existing (not a new build) what is the procedure for selecting the baseline constructions in the model. This building is outside the US.

6
Director
Passive Dynamics Sustainability Consultants
LEEDuser Basic Member
12 thumbs up
Wed Dec 16, 2015, 2:39 pm

Problem with FSC and COC shipped from other country.

NC-2009 MRc7:Certified Wood
posted by  Somsak Jidmon  on 

We have the LEED NC 2009 project that under construction and we attempt to get the credit of MRc7 - Certified Wood. We had looked and found the product of FSC label from China that we could use.

6
Senior Architect and LEED Consultant
GA Studio Co.,LTD.
LEEDuser Premium Member
1 thumbs up
Wed Dec 16, 2015, 3:29 am

Black Box Theater Occupancy and FTE

NC-2009 PIf3:Occupant and Usage Data
posted by  Katherine Mariano  on 

Hi, Would anyone know how to treat the actors, artistic team, production team? Will they be treated as transients or FTE? Hope someone could shed some light on this Thank You

2
Sustainability Account Manager
Stok
LEEDuser Expert
177 thumbs up
Wed Dec 16, 2015, 2:27 am

Outdoor Seating for a Restaurant

EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Gabriela Crespo  on 

Dear all, we have a multi-tenant project that includes restaurants, currently they have a smoking policy for outdoor seating, 1.is it possible to maintain the policy for outdoor smoking, if we comp

4
Tue Dec 15, 2015, 11:08 pm

Transients Again

NC-2009 PIf3:Occupant and Usage Data
posted by  Christopher Shaw  on 

I see many questions and answers on FTE's and visitors/transient, but none that quite makes it clear to me. So first, is the mail carrier who comes in once a day for oh 30 sec.

2
Tue Dec 15, 2015, 9:29 pm

Screw chillers

NC-2009 EAc4:Enhanced Refrigerant Management
posted by  Mehdi Kardehi  on 

Hi , There is no mention of screw chillers either under the credit EA 4 or ASHRAE application. I can only see absorption, scroll and reciprocating. Can someone please help me with the life span to

1
Sustainability Specialist
Gensler
LEEDuser Basic Member
66 thumbs up
Tue Dec 15, 2015, 8:48 pm

Lighting Controls Exemption

EBOM-2009 EAc3.1:Performance Measurement—Building Automation System
posted by  Katherine Roth  on 

Our project received the following review comment: "If any building spaces do not have automatic lighting control, provide information on the use and square footage of these spaces.

3
Tue Dec 15, 2015, 8:27 pm

LEED CS building with very minimum landlord provision

CS-2009 EAp2:Minimum Energy Performance
posted by  Michael Wahjudi  on 

Hi all, I have LEED CS with very minimum client provision without AC systems (only emergency lights, emergency fans and lifts).

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Dec 15, 2015, 7:07 am

Doing monthly photo report of IAQ management

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Indochine Engineering VN  on 

Hi, My project is under construction, but just structural work (finalizing substructure and launching superstructure). It is long way to furnishing and MEP work onsite.

5
Mon Dec 14, 2015, 11:25 pm

Office building - Standard 62.1-2013 - Which toilet type?

CS-v4 EQp1:Minimum indoor air quality performance
posted by  CHRISTOPHE MATHIEU  on 

Dear Leed user team, This question concerns the exhaust rate for toilets of an new office building.

3
Default Avatar
Sustainable Design And Construction Consultants, Paris, France
greenaffair
LEEDuser Basic Member
2 thumbs up
Mon Dec 14, 2015, 10:37 pm