Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

How to count Individual Worksations

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  SAMY Chamy  on 

Dears:- we have open office with 20 Desk.in every desk three occupants are working.That three occupants do the same operations in 15 desks in remaining desks they do different activities How can

4
Enginneer
T&T Green
LEEDuser Basic Member
9 thumbs up
Mon Feb 29, 2016, 5:21 am

LEED V4 - TENANT SPACE ENERGY MODELING

CI-2009 EAp2:Minimum Energy Performance
posted by  Paula Hernandez  on 

Hi, Regarding the Energy Performance Calgulator that should be used instead of Table 1.4, my questions are: 1.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Sun Feb 28, 2016, 3:53 pm

Energy modeling for LEED project (v3) requirement or not

LEED Rating System Selection
posted by  al-emran hossain  on 

We are going to start LEED project (Gold, points 66) in RMG factory at Bangladesh , if we will not consider in energy modeling for v3, that will accept or not , and required then which energy model

2
Energy Efficiency Ninja
Grumman/Butkus Associates
LEEDuser Premium Member
64 thumbs up
Sun Feb 28, 2016, 5:28 am

Concessions Spaces

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Deborah Ebersole  on 

We are looking to certify nineteen concession spaces in an existing airport. The spaces all share one mechanical system and one water source and do not appear to be sub-metered.

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Sat Feb 27, 2016, 9:11 pm

Use of renewable energy in calculation

ND-v4 GIBc2:Optimize building energy performance
posted by  Martine Desbois  on 

I just would like to confirm that we can use the renewable energy used in our buildings as part of the calculation for energy saving as is done in LEED NC. Is this correct?

3
Fri Feb 26, 2016, 4:58 pm

Whole building Energy and Water Usage Data

NC-2009 MPR6:Must commit to sharing whole-building energy and water usage data
posted by  Terry Squyres  on 

I was wondering if somebody could help walk me through this aspect of PIf1. My project is a University building in which we will have limited monitoring.

5
Drees&Sommer
LEEDuser Basic Member
4 thumbs up
Thu Feb 25, 2016, 8:04 pm

Recycled Content Criteria?

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Brad McAllister  on 

Option 2 states: Recycled content. Recycled content is the sum of postconsumer recycled content plus one-half the preconsumer recycled content, based on cost.

3
Thu Feb 25, 2016, 8:02 pm

High Recycled Content

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  barbara anderson  on 

In the past 6 months we have noticed that a high recycled content of 70% or more has been required on acoustic ceiling tile.

2
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Thu Feb 25, 2016, 7:43 pm

Naturally Ventilated

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Alejandro Macias  on 

Hi! I'm working on a one-story dormitory project.

2
Thu Feb 25, 2016, 4:52 pm

Providing dedicated area for mercury-containing products?

Healthcare-v2009 MRp2:PBT source reduction - mercury
posted by  Richard Barlow  on 

We are trying to respond to Prelim. Design review comments on a LEED-HC v2009 project for an Inpatient Hospice and Palliative Care facility.

2
Thu Feb 25, 2016, 2:24 pm