Forum quick links
Items that are used for either MRc4 or MRc3
NC-2009 MRc4:Recycled Contentposted by Erika Duran on
Dear All, I am unclear about something. If I have items that would qualify for MRc3 but we are not pursuing that credit, is it acceptable to count them towards MRc4?
Re-commisioning
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by John Wood on
I am a PE who has been approached by a building owner with a request to have the building "re-commissioned." I have designed LEED projects before, and participated in the original commissioning, b
Cx Authority
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Giuseppe Medeghini on
LEED manual states that: "The commissioning agent must demonstrate experience on two prior projects." the two project have to be LEED certified or they can be even no certified but with similar siz
'..with no air recirculation' is for exhaust system or AC system
CI-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Qiao LIANG on
LEED v3 reference guide has mentioned that 'the exhaust rate must be at least 0.5 cfm per square foot, with no air recirculation'..does it mean exhaust system or AC system???
Calculator Password
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Caroline Shannon de Cristo on
Is it possible to access the Indoor Water Use Reduction Calculator Excel file without a password? What password is this asking for?
Shopping mall
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Miriam Ramirez Baumgarten on
Hi, we have a project where the first 4 floors are retail (shopping center, including bowling and movie theatres). Because of the design of the shopping mall, most retail spaces do not have views
NC-v4 LTc2: Sensitive land protection/Wetland Protection
NC-v4 LTc2:Sensitive land protectionposted by Robyn Dowsey on
Is there a precedent anywhere for getting this credit with wetland mitigation plan where small inactive wetlands were included in the project footprint but an equal or greater wetland area was purc
CHP Modeling guidance
NC-v4 EAp2:Minimum energy performanceposted by Paula Rantanen on
Our project building is served by CHP system which generates both heat energy and electricity.
SSpc14 - Walkable project site
Pilot-Credits PC14:Walkable Streetsposted by Robert Cannellos on
I have a project in Miami that meets all the criteria of the SSpc14 credit, however I have a question to define the following requirement - "When a Façade extends along a sidewalk – no more than
hand-watering?
NC-2009 WEc1:Water Efficient Landscapingposted by Erin Holdenried on
I am working on a project that has courtyard with planters which will be planted with species that have very minimal watering requirements. The planters will be hand-watered when needed.