ASHRAE Baseline Constructions
NC-2009 EAc1:Optimize Energy Performanceposted by Alice chen on
Hi All, I am working on a large warehouse building with a small office building on the site. The warehouse is heated only, so I suppose that is semiheated space, is that right? While the office
Daylight controls
CI-v4 EAp2:Minimum energy performanceposted by Gabriela Crespo on
Dear all, We are working on a project to be certified CI v4. The use is a software development office, the building is 100% glazing in a very hot climate.
IDc1 Innovation - Green Cleaning LEED NC 2009
NC-2009 IDc1:Innovation in Designposted by William Brown on
We received feedback from GBCI that our Green Cleaning Policy lacks "Standard cleaning procedures to protect vulnerable building occupants.
June 2016 Update posted above to LEED Online Status Updates
posted by RETIRED on
Fire Station water calculations
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Heather Appell on
I am currently working on a Fire Station that has a total of 18 employees. However, each shift is 24 hours long and it's 6 employees per shift.
Constructive input I hope
posted by Phil Vanderloo on
I'm not sure who might agree or not but it seems to me that breaking up this forum into specific credits for specific LEED categories is not the best approach.
LEED for Homes Midrise and v4
posted by Michelle Rosenberger on
We have a client with a 7 story midrise residential project. We have always used LEED NC for their projects because they prefer it. That approach has always worked.
Operable windows & mechanically ventilated space
NC-2009 IEQp1:Minimum IAQ Performanceposted by Charalampos Giannikopoulos on
For a mechanically ventilated building for which the project team has attempted compliance with IEQc6.2 with operable windows the reviewer has commented at IEQp1 that the project may demonstrate co
Form
NC-2009 EAc2:On-Site Renewable Energyposted by GISELA FARHAT DE ARAUJO on
The EAC2 Form asks for "Annual Renewable Energy Cost". You said in a post that is "It is the avoided energy cost associated with the renewables at the virtual rate from the Proposed model.
Eac2 form
NC-2009 EAc2:On-Site Renewable Energyposted by GISELA FARHAT DE ARAUJO on
Hi. I have a 34,2 Kw solar system that generate 49.425 kWh/year. I need help to fill the form: 1- In table: Renewable energy - what information should I put in the item "Annual Energy Cost"?