Forum quick links
CHP electricity not used by the building
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
I'm modeling a building where hot water is provided by a district heating system. The district heating system is a cogeneration system (CHP).
30% structure and enclosure maximum
CS-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Rebecca Rice on
I have a v4 core and shell project whose total materials cost will be roughly $36,000,000. The total cost of interiors will be about $1,000,000.
TFA (Treated Frtesh air unit) - Energy Modeling
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by SAMY Chamy on
Dear all:- Our project have installed with VRF with TFA Unit Due to TFA unit usage we have significant saving in HVAC because outdoor air supply temperature is very low now we have some doubts in
Decorative blue light fixtures
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by Agnieszka Rylska on
In our office project there are daylight sensors within 15 feet of the windows which are connected to all lighting fixtures in daylit areas except for a few decorative fixtures on the ceiling (prov
delivery entrance in a shopping mall
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Agnieszka Rylska on
We are working on a project of a shopping mall. The building has a few delivery entrances (on the ground level and underground level) next to the delivery docks.
GC Responsible for Implementing Option B?
NC-2009 EAc5:Measurement and Verificationposted by Marcia Weekes on
Does anyone have any experience with projects where a GC has been given the responsibility for implementing the M&V credit using Option B?
A material with zero VOC content
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by dia2000@gmail.com dia2000@gmail.com on
Hello, We are submitting data about certain materials that has "zero" VOC content according to manufacturer's datasheet.
Anti-Rust vs flat primer
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Michelle Raigosa on
Does anyone have any insight/thoughts/comments/experience about categorizing an anti-rust coating as compared to categorizing the product as a flat coating/primer?
Registering A Project- Client's Obligations?
posted by Rosemary Ziemann on
Loading dock and parking to be counted in Gross Floor Area?
NC-2009 PIf2:Project Summary Detailsposted by Deborah Lucking on
Until last week I was pretty sure that all parking whether enclosed by the building, or on the roof of a building should be excluded from the Gross Floor Area number.