Forum quick links
Emergency Power
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Brightworks Sustainability on
The engineer on my project is asking what exactly needs to be submetered and I'm having difficulty answering just because I'm not as familiar with the credit details.
Demand Control Ventilation
NC-2009 EAp2:Minimum Energy Performanceposted by Victoria Watson on
Hi, I am wondering what savings can be taken by using room occupancy controls to control the HVAC system in a 24/7 building.
Hot link to South Coast website rule is broken
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Harry Flamm on
Just a minor note that the link for "SCAQMD Rule 1113" listed above, to the left under Organizations in the Resources menu, no longer goes to the appropriate South Coast page.
HOTEL Project Default Occupation
CS-2009 PIf3:Occupant and Usage Dataposted by Amanda Johnson on
Hello, Using the Annexe 1 C&S default occupation values, a hotel would have FTE plus Transient occupants.
Designed case AHU fanpower
NC-2009 EAp2:Minimum Energy Performanceposted by Rathnashree Bharadwaj on
Hello, Do we have to calculate design fan power from the formula HP=CFMx Total static pressure/6356 x fan efficiency or consider the motor fan power provided in the technical AHU datasheet in the
Outdoor Airflow Rates in HVAC system exceptions
CS-2009 EAp2:Minimum Energy Performanceposted by Martin K on
Hi all! I can't figure it out how to model an excepted spaces and its baseline systems correctly. Here is my issue: We are working on office building, C&S v2009, HVAC completely designed.
Counted interstions within the project boundary?
ND-v2009 NPDp3:Connected and open communityposted by Raymond Salfiti on
Hello, In counting the eligible intersections for NPDp3 option 1, if the LEED boundary was drawn to exclude the streets bordering the project, would an intersection of a project street with the bor
Ventilation as Process Load
NC-2009 EAp2:Minimum Energy Performanceposted by Ricardo Sá on
Hi! I'm currently working on a project regarding an office building.
Energy modeling
CI-2009 EAp2:Minimum Energy Performanceposted by Charalampos Giannikopoulos on
Would energy modeling according to EAc1.3 requirements be a way to comply with EAp2? If yes, what would be the minimum percentage of improvement required?
One or Two Documents
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Omar Elrawy on
I'am confused about the document entitled "IAQ Management Plan" that is required under both; IEQc3.1 and IEQc3.2. Should I prepare only one document including IAQ during construction and flush-out