Forum quick links
EAp1 Minimum Energy Performance Calculator
NC-2009 EAp2:Minimum Energy Performanceposted by sriram tetali on
Hi, Please help us in solving the Errors in the Minimum Energy Performance Calculator. Project Registered under => LEED NC BD+C -v3 (2009) • Macros are not getting enabled • Shading & Fenes
Performance Period for Recertification
EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitatposted by Frances Yang on
For EBOM recertification purposes, my project is achieving SSc5 for the first time, through the off-site option. What I know: - For a first certification, we would get a contract to maintain an off
Wood Derived Fuel - Used in Home Fireplace
NC-2009 MRc2:Construction Waste Managementposted by Mario S. on
We are working on a project that generates a lot of scrap wood from formwork.
CxA Same for all Paths?
NC-v4 EAc1:Enhanced commissioningposted by Brian Salazar on
Does the CxA need to be the same firm/person for Path 2 and Option 2, as it does for Path 1?
Permanently Installed Furniture?
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Michael Smithing on
Option 1 requires that products be permanently installed. Do furniture products installed in a LEED CI project qualify for inclusion in the EPD list?
Value of Enhanced Commissioning
NC-v4 EAc1:Enhanced commissioningposted by Hannah Fleck on
I have a client who is asking what the value of pursuing enhanced commissioning versus fundamental.
LEED compliant Drywall
posted by Phil Vanderloo on
I'm trying to search out some LEED compliant drywall for the material and resources credit, (homes v4). Needs to be either 25% post consumer recycled product or 50% pre consumer recycled product.
Access to LEED Pilot Credits
posted by Sara Goenner Curlee on
Speculative Retail - No Meters Provided.
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Ciaran McCabe on
Im working on a mixed use development that consists of office space and retail units.