Log in
Forum » Credit Forums
Topic

Renovation versus Demolition

NC-2009 IDc1: Innovation in Design
posted by sara frye on Apr 4, 2011, 10:42 am

After much research and discussion it was decided to renovate an extremely decrepit farmhouse, portions of which date back to the 18th century. The renovation will serve as a visitor center with...

Last reply: Tristan Roberts, Apr 4, 2011, 3:36 pm

Applicable to LEED NC 2009?

EBOM-2009 MRc4: Sustainable purchasing - reduced mercury in lamps
posted by Eamon Geary on Apr 4, 2011, 9:29 am

Our staff has utilized this credit in multiple 2.2 projects successfully. However, with the change to...

Last reply: Kimberly Frith, Apr 4, 2011, 12:49 pm

Floor area calculation

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Lorely Gonzalez on Mar 25, 2011, 11:17 am

What is "...

Last reply: Eddy Santosa, Apr 1, 2011, 6:13 pm

Option 2: Floor Area Clarification

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Shannon Terrell on Mar 21, 2011, 6:24 pm

If my...

Last reply: Eddy Santosa, Apr 1, 2011, 6:09 pm

Purchasing REC's after the submittal?

EBOM-2009 EAc4: On-Site and Off-Site Renewable Energy
posted by Alice Cook on Dec 21, 2010, 11:28 am

The building owner for our project would like to purchase...

Last reply: Lana Malone, Apr 1, 2011, 4:15 pm

Multi-parameter alternative product analysis

Pilot-Credits PC2: PBT Source Reduction: Dioxins and Halogenated Organic Compounds
posted by Jeff Gearhart on Mar 24, 2011, 9:51 am

We are pursuing this credit for a CI project. Interested in any further guidance on "multi-parameter alternative product analysis". I have done and seen a variety of alternatives assessments,...

Last reply: Whit Faulconer, Apr 1, 2011, 3:18 pm

Regional Prioritiies

CI-2009 RPc1: Regional Priority
posted by Kathleen Burke on Apr 1, 2011, 1:34 pm

there are sip codes missing for the enitre Kansas City Missouri area-64105, 64106, 64108, etc-i caled the USGBC and the person said that maybe that means there are n't any for that area-I don't...

Last reply: Shillpa Singh, Apr 1, 2011, 1:54 pm

Flowing water Pressure for Kitchen Sink

NC-2009 WEp1: Water Use Reduction
posted by Yong Lee Low on Mar 1, 2011, 5:29 am

My project is a commercial building. All the fittings except Kitchen sink have been finalized. by assuming a flowrate of 4.3L/min for sink, I have 36% savings and so have advised the architect...

Last reply: Erica Downs, Apr 1, 2011, 8:35 am

Flush Flow Rate Measurment

EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by Everardo Ocampo on Oct 4, 2010, 5:33 pm

Can someone please advise me on how to measure flush flow rates (i.e., urinals, water closets)? I know LEED wants us to do measurements for a 20% sample of fixtures with unknown flow rates. I'm...

Last reply: university hall, Mar 31, 2011, 11:33 pm

Error Message when trying to select Complete

EBOM-2009 WEc1: Water Performance Measurement
posted by Cynthia Fowler on Mar 31, 2011, 8:36 am

I get the following message when I try to click "Complete" for the credit:
"...Form shows that documentation requirements have not been met..."
I checked and rechecked and verified...

Last reply: Barry Giles, Mar 31, 2011, 10:54 pm