Shading from trees planted on roofNC-2009 SSc7.2: Heat island effect - roofposted by Rob Hink on Jun 29, 2011, 2:56 pm
We are designing a building with a "garden lounge" on the roof. The roof will have 3 large canopy trees that will shade a significant portion of the roof. The project is in South Florida so the... Last reply: Susann Geithner, Jul 5, 2011, 1:20 pm |
|
Clarification for credit applicationPilot-Credits PC27: Reconcile Designed and Actual Energy Performanceposted by monu goyal on Jun 30, 2011, 2:11 am
hii, We are doing LEED - CI project, I am getting what should I submit at design stage, I can submit copy of contract, google survey and a draft M&V plan. Is this will meet the credit... Last reply: Marcus Sheffer, Jul 2, 2011, 9:32 am |
|
More LCA Score QuestionsPilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materialsposted by Dirk Kestner on Jul 1, 2011, 1:11 pm
Were Laura’s questions from April 7th ever resolved? I just input some data for a new project and am also getting a score over 100. I think that some units are off between what EC outputs and... |
|
Epoxy FlooringNC-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Lauren Sparandara on Aug 23, 2010, 7:18 pm
Hey Mara (or others), I have a lot of projects that have been asking me about epoxy flooring and recently also received a question about epoxy flooring under EQc4.3 on LEEDuser.com. I don'... Last reply: Sylvia Schwartz, Jul 1, 2011, 11:17 am |
|
Demand-Controlled VentilationCS-2009 EAc1: Optimize Energy Performanceposted by Redy Truccolo on Jun 30, 2011, 12:22 pm
Hi, in my proposed HVAC system I want to use a demand-controlled outdoor air ventilation (with motorized dampers controlled by... Last reply: Marcus Sheffer, Jul 1, 2011, 10:56 am |
|
LEED Commissioning vs. "Total Building Commissioning" (TBCx)NC-2009 EAc3: Enhanced Commissioningposted by Matt Nolan on Jun 3, 2011, 6:41 pm
I am seeing more and more project requirements (for new buildings) mentioning TBCx (Total Building Commissioning)- which is based on ASHRAE Guideline 0. I'm not real familiar with it, and don't... Last reply: Gary Shlifer MS, LEED AP BD+C, Homes, Jun 30, 2011, 12:01 pm |
|
how to documentPilot-Credits PC26: Advanced Energy Meteringposted by monu goyal on Jun 29, 2011, 2:32 am
hii, we are doing LEED-CI project, and we have installed submeters like BTU meter, kwh meters and also implementing EA Credit 30. Measurement and Verification. Also above of this we have BMS... Last reply: monu goyal, Jun 30, 2011, 3:32 am |
|
LEED Core and Shell: Energy Performance ImprovementCS-2009 EAc1: Optimize Energy Performanceposted by Jeann Vieira on Jun 28, 2011, 12:58 pm
When modeling a building under the Core and Shell system, do I have to compare the energy performance only between systems under the project scope, i.e. Core and Shell? Or do I have to compare... Last reply: Marcus Sheffer, Jun 29, 2011, 5:20 pm |
|
Showing energy savings in drug manufacturing facilitiesNC-2009 EAc1: Optimize Energy Performanceposted by CRB Sustainability on Jun 29, 2011, 4:39 pm
Has anyone performed an exceptional alculation to demonstrate energy savings in a drug manufacturing facility for EAc1? We are trying to demonstrate an improvement and savings by lowering the... |
|
Exemplary Performance for ViewsNC-2009 IEQc8.2: Daylight and views - viewsposted by Andrew Slusser on Nov 18, 2010, 12:43 pmunder review, definitely will keep you and the forum up to date on the result. If there is still clarity that needs to be resolved I may call Heschong-Mahone... Log in or register to post comments Tristan... Last reply: Bonnie Chiu, Jun 29, 2011, 3:06 pm |