shift workNC-2009 SSc4.2: Alternative transportation - bicycle storage and changing roomsposted by Martin Mechtenberg on Nov 21, 2009, 11:05 am
This question is really in regards to NC 2.2, but I assume the same would apply here: Do projects with shift work need to provide bike racks for the... Last reply: Mark Meaders, Sep 12, 2011, 11:09 am |
|
Documentation- No Extraction Location DataCI-2009 MRc5: Regional Materialsposted by Kellie Hollenbeck on Aug 31, 2011, 5:46 pm
I may have missed this but, what does the project team input in the template if there is no extraction data provided from the manufacturer but they have the manufacturing distance and wish to... Last reply: Kellie Hollenbeck, Sep 12, 2011, 8:53 am |
|
FSC Controlled labelNC-2009 MRc7: Certified Woodposted by mary ostafi on Jun 10, 2011, 10:06 am
LEED v3 clearly states that... Last reply: Kerry Little, Sep 10, 2011, 12:07 pm |
|
Small Sized printersCI-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by Sundararaj Subburaman on Mar 16, 2011, 1:03 am
I am working on a CI project, which requires small sized printers to placed in the floor area for particular working groups, do we have to consider the small sized printers to be placed inside... Last reply: Daniela Castro Salgado, Sep 9, 2011, 6:10 pm |
|
100% Municipal Non-Potable WaterNC-2009 WEc1: Water Efficient Landscapingposted by Michelle Rosenberger on Sep 7, 2011, 1:36 pm
Our project will irrigate with a drip irrigation system using 100% municipally supplied non-potable water. The way I am reading this credit, we cannot get any points for using non-potable water... Last reply: Susann Geithner, Sep 9, 2011, 2:34 pm |
|
Which Waste Streams Should Be Included?NC-2009 MRp1: Storage and Collection of Recyclablesposted by Jane Long on Sep 8, 2011, 8:01 am
Hi All. Is this credit specifically for office waste or all waste streams? I’m working on a large industrial factory building, and whilst the operator has a policy of recycling... Last reply: Lisa Fabula, Sep 9, 2011, 1:42 pm |
|
Lighting Controllability in Restaurant Dining & Bar AreasNC-2009 IEQc6.1: Controllability of systems - lightingposted by Karla Fisk on Jul 26, 2011, 9:57 am
Has anyone ever had a restaurant NC project where you were able to come up with a method of controlling lighting in the dining/bar area? Last reply: Lauren Sparandara, Sep 9, 2011, 12:51 pm |
|
Industrial buildings: EAc1 Optimize Energy PerformanceCS-2009 EAc1: Optimize Energy Performanceposted by Jane Long on Apr 5, 2011, 9:36 am
Hi, I’m working on a pre-assessment for a large manufacturing (aircraft) plant. While a number of ‘reduction’ strategies are being considered, they do not represent a significant... Last reply: Jane Long, Sep 9, 2011, 11:42 am |
|
lavatory faucets with different flow rateCI-2009 WEp1: Water Use Reductionposted by Grace Ming on Aug 22, 2011, 6:52 am
Hello All, Last reply: Susann Geithner, Sep 9, 2011, 10:43 am |
|
Cost of Renewable EnergyNC-2009 EAc1: Optimize Energy Performanceposted by Gregg Achtenhagen on May 26, 2011, 11:57 am
I am going to be modeling a building that plans on buying landfill gas to burn in boilers which will contribute to EAc2. I know I can double-dip on EAc1 and EAc2, so do I need to include... Last reply: Christopher Schaffner, Sep 8, 2011, 1:25 pm |