Garage and technical roomsNC-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by BH . on Aug 30, 2011, 10:01 am
Hello, We are dealing with project with underground garage, where adjacent spaces are technical rooms. Can we transfer the air from the garage to the technical rooms to ventilate them? Do... Last reply: Dylan Connelly, Sep 22, 2011, 3:01 pm |
|
Option 1: Full Flush-out Before Occupancy- Is there a Min. CF?CI-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Michelle Bracewell-Musson on Aug 4, 2011, 10:50 am
With Option 1, Path 1, we are expected to flush-out 14,000 cf/sf of outdoor air at 60 degrees temp. and 60% humidity min. Is there a minimum ventilation rate as with Path 2 which is 0.30 cf/min... Last reply: Dylan Connelly, Sep 22, 2011, 11:37 am |
|
Outdoor Air Delivery Monitoring System installed post-occupancyCI-2009 IEQc1: Outdoor Air Delivery Monitoringposted by Philip Herriges on Aug 23, 2010, 6:22 pm
Our building owner is having a building-wide outdoor air delivery monitoring system installed throughout the building (not just in the LEED-tenant area of our project) but it won't be installed... Last reply: Dylan Connelly, Sep 22, 2011, 11:24 am |
|
Non-Densely Occupied Spaces Served by Existing AHUCI-2009 IEQc1: Outdoor Air Delivery Monitoringposted by Michelle Ruda on Sep 20, 2011, 2:33 pm
If you have non-densely occupied spaces served by an existing... Last reply: Dylan Connelly, Sep 22, 2011, 11:20 am |
|
CI on site Green Power?CI-2009 EAc4: Green Powerposted by Robin Hurt on Aug 17, 2011, 3:27 pm
Is it possible to install onsite... Last reply: Tristan Roberts, Sep 22, 2011, 12:53 am |
|
REC vendors for Singapore ProjectCI-2009 EAc4: Green Powerposted by Yong Lee Low on Aug 25, 2011, 6:46 am
For our Singapore projects, we need to buy... Last reply: Lana Malone, Sep 21, 2011, 4:18 pm |
|
Green Power for LEED-CI RetailCI-2009 EAc4: Green Powerposted by Linda Davisson on Aug 22, 2011, 11:48 am
Can anyone confirm that Green Power is 2 points for LEED-CI Retail instead of 5 points for LEED-CI? That is what the LEED-CI Retail rating system indicates, but it is such a significant... Last reply: Lana Malone, Sep 21, 2011, 4:17 pm |
|
Who Can Execute an REC Contract with VendorNC-2009 EAc6: Green Powerposted by Elliot Powers on Aug 12, 2010, 1:50 am
I haven't found anywhere in the LEED-NC 2009 Ref. Guide that stated which party has to execute the... Last reply: Marcus Sheffer, Sep 21, 2011, 2:22 pm |
|
Cost to be Excluded in the total proj material costs for MR CR3NC-2009 MRc3: Materials Reuseposted by Benjie Herrera on Sep 16, 2011, 8:41 am
I just want to inquire if we will include HVAC equipment, PV arrays, Solar hotwater collectors, generator, fire alarm control panels, etc. in our overall project materials costs when calculating... Last reply: Patty Breech, Sep 21, 2011, 12:29 pm |
|
Too much Window Area (WA)?Schools-2009 IEQc8.1: Daylight and views - daylightposted by Rebecca Griffith on Feb 22, 2011, 6:52 pm
Is it possible to have too much window area, therefore disqualifying a room from being included in the total daylit area? I am using the prescriptive calculation and the spreadsheet from the... Last reply: TODD REED, Sep 21, 2011, 8:51 am |