Pavement and Trees

NC-2009 MRc2: Construction Waste Management
posted by Michelle Teague on Sep 8, 2011, 9:46 pm

The definition of construction and demolition debris on page 362 of the technical guide says "pre-existing structures". I understand the exclusion of land clearing debris, such as soil,...

Last reply: Tristan Roberts, Sep 26, 2011, 10:32 pm

NEBB Certification Required?

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Nathan Lee on Sep 8, 2011, 8:48 pm

A question about NEBB Certification. Is the...

Last reply: Tristan Roberts, Sep 26, 2011, 9:58 pm

Required Number of Construction Inspections?

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Benjamin Tressler on Sep 19, 2011, 11:19 am

Does LEED specify a required number of...

Last reply: Tristan Roberts, Sep 26, 2011, 9:52 pm

Control types in Group Multi-occupant Spaces

EBOM-2009 IEQc2.2: Controllability of systems - lighting
posted by Jenny Carney on Mar 7, 2011, 5:48 pm

All,

Word on the street is that there's a new standard teams are being held to for the types of controls that are allowed in group spaces. Historically, pretty much any kind of control was...

Last reply: Andrea Marzullo, Sep 26, 2011, 3:52 pm

LZ2 10 foot “hot spots”

NC-2009 SSc8: Light Pollution Reduction
posted by Vincent Pieri on Sep 26, 2011, 3:36 pm

We are owrking on a project on previously developed land that we have established as complying with IESNA LZ2. The surface parking for the project runs along the Southern edge of our site, which...

Floor area calculating

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Mohamed Ravuthar, LEED AP, BD+C on Sep 25, 2011, 9:52 am

I'm using the Option 2 - Prescriptive Approach for this credit, In particular room has 6 windows and each side two and one side no windows. Now i have calculated the window area and floor area...

Last reply: TODD REED, Sep 26, 2011, 10:14 am

Regularly occupied spaces for stadiums

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Adriana Hansen on Sep 22, 2011, 5:53 pm

We are in doubt about the classification of regularly occupied spaces for a stadium.
It will have the administrative area that will obviously be regularly occupied, but what about the VIP...

Last reply: TODD REED, Sep 26, 2011, 10:11 am

Existing Finish

CI-2009 MRc1.2: Building reuse - maintain interior nonstructural elements
posted by Sara Neff on Apr 28, 2011, 3:29 pm

I looked through the reference guide for a definition of 'finished,' but I couldn't find one, so I'm hoping someone here can help: I have a CI project that is moving into a space that has...

Last reply: Raymond Loo, Sep 25, 2011, 6:05 am

Meeting humidity requirements with mixed mode

NC-2009 IEQc7.1: Thermal comfort - design
posted by Carly Ruggieri on Aug 16, 2011, 10:42 am

Does anyone have any experience or guidance for documenting compliance with ASHRAE 55 with a mechanically conditioned, naturally ventilated building? When windows are open, the required humidity...

Last reply: Patrik Lazzari, Sep 23, 2011, 11:49 am

Help needed: Process Energy / Water- 25% Default vs. Actual

NC-2009 EAc1: Optimize Energy Performance
posted by Dan Prows on Feb 10, 2010, 4:09 pm

We have a child care center in the SE US. We did very well on envelope, lighting, and mechanical design (53% reduction in those areas). The building has a commercial kitchen with several...

Last reply: Marcus Sheffer, Sep 23, 2011, 9:23 am