Forum quick links
IEQp1: Exhaust fans for public/private lavatories, kitchen,
NC-2009 IEQp1:Minimum IAQ Performanceposted by RICHARD CUEBAS on
IEQp1: Exhaust fans for public and private lavatories, kitchen, cafeteria and multiuse court Our project is a new school. The Design Final Review denied IEQp1 with two comments.
FSC vs SFI
EBOM-2009 MRc1:Sustainable Purchasing—Ongoing Consumablesposted by Kay Sieck on
Why does LEED not recognize SFI products? We purchase products with that label such as our hanging folders and file folders. Does it count as and FSC product? Thanks for the help
Contractor specification template software or forms
NC-2009 MRc2:Construction Waste Managementposted by John Covello on
This is more of a general question. Does anyone have experience with Green Building Specifications for Sustainable Development software from UDA (uniteddesign.com)?
SSc1 path 7,8
CI-2009 SSc1:Site Selectionposted by Mark Taake on
Is it possible to achieve only the points for path 8, without achieving path 7? Under path 8, the wording states that the 2 points are in addition to path 7. So is path 7 a pre-requisite for 8?
thermal comfort calculations for a shopping mall
CS-2009 IEQc7:Thermal Comfort—Designposted by Adam Targowski on
How should I conduct PMV and PPD calculations for a shopping mall?
Future
NC-2009 EAp2:Minimum Energy Performanceposted by Graham Langton on
How should a future process be taken into account?
Site with no parking lots - LEED ND Project
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Gaston Viau on
Our project is located into a LEED ND.
Mixed use: Production; Shipping/Receiving; R/D; Office Space
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Aaron Nelson on
The building has four space types and 20 AHUs. The building lacks any integrated controls, so each AHU operates independent of the other.
Ashrae 62.1 vetilation rate - Constant OA with VAV system
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Bradford Crosby on
We have a constant volume air fan feeding many floors. It feeds the mechanical space using it as a plenum. At the floor level there is a Supply fan serving the VAV and Fan boxes.
P1 Form 4 Core and Shell Scope Upload L-6
NC-2009 PIf4:Schedule and Overview Documentsposted by Phil Meyer on
I have a question regarding appropriate document types for Upload L-6. The developer intends to achieve LEED credits for the building based on tenant cooperation/compliance.