We have a constant volume air fan feeding many floors. It feeds the mechanical space using it as a plenum. At the floor level there is a Supply fan serving the VAV and Fan boxes. The floor AHU only has a cooling coil, the heat is provided by reheats. Is it correct to use the maximum cfm for Vdzd and 100% for the Ds? When I use the minimum cfm for this calculation the required OA actually drops.
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.