Building Flush Out - Chilled Beams / Radiant Cooling
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Nandana Kumar on
We have couple of projects where the HVAC system is being served by Chilled Beams and Radiant Cooling.
Janitor Closets in the Base Building
CI-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Julie Hendricks on
We have existing janitor closets in the base building that are on and serve the tenant floors we are building out.
District Cooling system and energy modeling(visualDOE)
NC-2009 EAp2:Minimum Energy Performanceposted by Mohamed Ravuthar, LEED AP, BD+C on
How to handle District Cooling system into energy modeling(visualDOE). 1.Is it required to do energy modeling for District Cooling system for LEED?
Unitary Cooling Efficiencies
NC-2009 EAp2:Minimum Energy Performanceposted by TOMAS URIBE on
Hello, We are simulating a type 4 system in our baseline and need to know if the efficiency ratings specified in table 6.8.1B (and tables 6.8.1.A, 6.8.1D) do include supply fan power and hence ne
OPR Translation
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by LEED Pro Consultant on
I'm from Mexico and my client ask me to translate the 120 page OPR document from Spanish to English with the argument that USGBC will need it that way. The templates of this prerequisite and the c
FTE's for Convention Center
posted by Kay Sieck on
Has anyone calculated FTE's for a Convention Center. I have been working on this credit and am still not comfortable with my numbers.
Hotel
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Nelina Loiselle on
To satisfy the LEED requirements, does every room in a hotel have to be commissioned?
purchasing of carpets
EBOM-2009 MRc3:Sustainable Purchasing—Facility Alterations and Additionsposted by Fatma Al-Fahad on
I need your advice regarding purchasing sustainable carpet that meets LEED requirement.
Roof or Non-roof?
CS-2009 SSc7.1:Heat Island Effect—Nonroofposted by Katherine Ann Resurreccion on
Hi All, We are working on a high-rise office project that will sit on top of an existing structure.
Option 1 - Football Stadium and Bullfighting Ring
NC-2009 SSc2:Development Density and Community Connectivityposted by Alicia Villanueva on
We are trying to achieve this credit through option 1 documenting the buildings located within the 1/2 mile radius.