district CHP system
NC-2009 EAc1:Optimize Energy Performanceposted by Giorgia Lorenzi on
I am modeling a building which is connected to a district CHP system.
Offsite Landscape
CS-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Irina Serrano on
I'm working on a project in Sao Paulo, Brazil and our project will implement a green area (1506.95 sf) outside our leed project boundary.
Utilizing a Campus Shuttle to connect to Public Transit
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Eamon Geary on
For a military base project, the facility is connected to a campus shuttle with 20+ stops.
Historical uses
Pilot-Credits SSpc16:Rainwater managementposted by nancy Charron on
I have a urban site project that has had 2 prior buildings before this one. The most recent prior historical use was all impervious surfaces.
Building Flush Out - Chilled Beams / Radiant Cooling
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Nandana Kumar on
We have couple of projects where the HVAC system is being served by Chilled Beams and Radiant Cooling.
Janitor Closets in the Base Building
CI-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Julie Hendricks on
We have existing janitor closets in the base building that are on and serve the tenant floors we are building out.
District Cooling system and energy modeling(visualDOE)
NC-2009 EAp2:Minimum Energy Performanceposted by Mohamed Ravuthar, LEED AP, BD+C on
How to handle District Cooling system into energy modeling(visualDOE). 1.Is it required to do energy modeling for District Cooling system for LEED?
Unitary Cooling Efficiencies
NC-2009 EAp2:Minimum Energy Performanceposted by TOMAS URIBE on
Hello, We are simulating a type 4 system in our baseline and need to know if the efficiency ratings specified in table 6.8.1B (and tables 6.8.1.A, 6.8.1D) do include supply fan power and hence ne
OPR Translation
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by LEED Pro Consultant on
I'm from Mexico and my client ask me to translate the 120 page OPR document from Spanish to English with the argument that USGBC will need it that way. The templates of this prerequisite and the c
FTE's for Convention Center
posted by Kay Sieck on
Has anyone calculated FTE's for a Convention Center. I have been working on this credit and am still not comfortable with my numbers.