Natural Ventilation Form Filling
NC-2009 IEQp1:Minimum IAQ Performanceposted by Aaron Levey on
Hi everyone, We have a residential project which has around 600 rooms naturally ventilated. I've prepared an excel sheet to demonstrate compliance with natural ventilation requirements.
Splitting credit for renewable energy to 2 different buildings?
NC-2009 EAc2:On-Site Renewable Energyposted by Renee Shirey on
We have a few schools from the same district being built at the same time, and we are considering adding PV to some/all of them.
Demoltion before possession
NC-2009 MRc2:Construction Waste Managementposted by Pamela Lippe on
If demolition is done by a landlord before a tenant has taken possession, does it have to be included in the calculations for LEED CI?.
Tenant storage vs Host Building storage.
CI-2009 MRp1:Storage and Collection of Recyclablesposted by Luis Leal on
We separate the waste in 3 in the tenant space: organic, paper and recyclables.
WEp1 Retail NC – Process Water
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Maria Porter on
Hi, I need help with my first process water calculation. On LEED Online: What does “ADO” mean? Could it be “Annual Days of Operation” maybe?
Case 2
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by AAME User on
If the 62MZ calculator reveals that the critical zone is a zone with cooling only (with a min of 0), is that an appropriate reason to pursue Case 2?
About Table 1.Standard VOC Limits
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Albert Sagrera on
Hi, about the table 1. Standard VOC Limits, which values we might use, Ceiling Limit or Effective Date? Thank you,
Prescriptive approach - adjusting VLT for an overhang
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Ramana Koti on
Greetings all. One one of our LEED projects, we're using the prescriptive approach of VLT*WFR falling within the range of 0.15 and 0.18.
Dorm Rooms
EBOM-2009 IEQc2.2:Controllability of Systems—Lightingposted by American University on
We're pursuing EB:O&M on several campus buildings including residence halls, classroom buildings, and office buildings.
Air-tight Drywall Approach/Compartmentalization &Sprinkler Heads
posted by Kathy Kahill on
What are people doing out there for sealing quick-response sprinkler heads in mid-rise projects? I've been told that the gasket approach cannot be used with quick-response heads.