Natural Ventilation Form Filling

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Aaron Levey  on 

Hi everyone, We have a residential project which has around 600 rooms naturally ventilated. I've prepared an excel sheet to demonstrate compliance with natural ventilation requirements.

1
Wed Jul 18, 2012, 1:25 am

Splitting credit for renewable energy to 2 different buildings?

NC-2009 EAc2:On-Site Renewable Energy
posted by  Renee Shirey  on 

We have a few schools from the same district being built at the same time, and we are considering adding PV to some/all of them.

1
Fri Aug 31, 2012, 1:46 pm

Demoltion before possession

NC-2009 MRc2:Construction Waste Management
posted by  Pamela Lippe  on 

If demolition is done by a landlord before a tenant has taken possession, does it have to be included in the calculations for LEED CI?.

1
Thu Jun 28, 2012, 12:59 pm

Tenant storage vs Host Building storage.

CI-2009 MRp1:Storage and Collection of Recyclables
posted by  Luis Leal  on 

We separate the waste in 3 in the tenant space: organic, paper and recyclables.

0

WEp1 Retail NC – Process Water

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Maria Porter  on 

Hi, I need help with my first process water calculation. On LEED Online: What does “ADO” mean? Could it be “Annual Days of Operation” maybe?

1
Wed Jun 27, 2012, 3:47 pm

Case 2

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  AAME User  on 

If the 62MZ calculator reveals that the critical zone is a zone with cooling only (with a min of 0), is that an appropriate reason to pursue Case 2?

1
Wed Oct 3, 2012, 3:40 pm

About Table 1.Standard VOC Limits

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Albert Sagrera  on 

Hi, about the table 1. Standard VOC Limits, which values ​​we might use, Ceiling Limit or Effective Date? Thank you,

1
Tue Jul 17, 2012, 7:51 pm

Prescriptive approach - adjusting VLT for an overhang

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Ramana Koti  on 

Greetings all. One one of our LEED projects, we're using the prescriptive approach of VLT*WFR falling within the range of 0.15 and 0.18.

1
Wed Jun 27, 2012, 8:43 pm

Dorm Rooms

EBOM-2009 IEQc2.2:Controllability of Systems—Lighting
posted by  American University  on 

We're pursuing EB:O&M on several campus buildings including residence halls, classroom buildings, and office buildings.

1
Wed Sep 5, 2012, 12:56 am

Air-tight Drywall Approach/Compartmentalization &Sprinkler Heads

LEED for Homes (LEED-H) Forum
posted by  Kathy Kahill  on 

What are people doing out there for sealing quick-response sprinkler heads in mid-rise projects? I've been told that the gasket approach cannot be used with quick-response heads.

0