Grouting
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Petra Hajná on
Hi. We want to use a grout for surface leveling under the baseplate of steel anchors on roof.
Faucet flow rate test and restraining measure
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Charlie Zhu on
Hi. As requested by the review team, we need to prove the faucet flow rate. However, we can not find any data from the manufacturer. We use a basin and a stopwatch to test the flow rate.
Greenguard-Certified Systems in International Projects (Asia)
CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seatingposted by Raymond Loo on
Have any of you had any experience in dealing with this credit in an international project, particularly in Asia? Has anyone ever heard of NQA / UKAS Environmental Management.
Commissioning for LEED-CI
CI-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by monu goyal on
We are going to commission our interior space to get certify with LEED-CI.
REC vendors for Singapore Project
CI-2009 EAc4:Green Powerposted by Yong Lee Low on
For our Singapore projects, we need to buy REC but are not sure where to start searching?
General LEED-CI question
CI-2009 MRc4:Recycled Contentposted by Kimberly Cullinane on
I am working with a client that is looking at multiple new spaces in multiple locations.
PVs added after design submission
NC-2009 EAc2:On-Site Renewable Energyposted by Aliesa Adelman on
If an energy model has been reviewed during design phase submission and PVs are added during construction but were not included in the model, can the model be rerun and resubmitted during the const
Community Connectivity - residential density
CS-2009 SSc2:Development Density and Community Connectivityposted by Mark Pappas on
I am working on a project (LEED CS 2.0) that easily meets the services requirement, but I'm having a hard time with the residential density requirement.
Accumulating Annexes
posted by Paola Figueiredo, Newton Figueiredo on
The credits seem to be accumulating annexes, for example, after uploading an annex in the templates for the SS 4.1 credit, it appears later in the following credits as an upload, even for templates
Peak Demand Reduction Credit NOT Demand Response
Pilot-Credits EApc8:Demand responseposted by Debra Lombard on
HI Everyone, I am working on a LEED-NC v2.2 project which is small but has three technologies that reduce peak demand which is critical here in Connecticut. My question is how to calculate that %